Laserfiche WebLink
, �.. .� <br />BAKERENGINEERS �` ` EUWINF.BAKEN,P.E <br />STRUCNRAL DESIGN <br />P.O.BO% 1697 <br />LVNNWOOD. WA 980E6169.' <br />September 26, 1')92 <br />The Reese Associates <br />425 Coleman Building <br />811 First Avenue <br />Seattle, Washington 98104 <br />Reference: Everett Mall Bon Marche <br />Job No. 10.92.120 <br />Dear Ron: <br />It is our understanding the roof repair and seismic upgrade for the <br />subject building will be done under separate permit with the former <br />to be completed first. <br />In our structural analysis of the building for the seismic upgrade <br />we have determined the fo:lowing two items which relate to the roof <br />repair portion of the work. <br />1. The additional dead load of roofing material of 0.32 psf <br />can be supported with the existing roof system without any <br />changes. <br />2. Some additional nailing of the plywood roof diaphragm will <br />be required. The exact details will be determined and set <br />forth in a drawing at a later date. It is proposed that <br />this nailing be included with the roofin.; permit and that <br />it be monitored by special inspection. <br />Shoulu you have any questions please contact us. <br />Sincerely, <br />`B�AAER E[JGINEERS � <br />f�� , . <br />EdWin F. Saker, P.E. <br />Princip <br />C.T. LarN , .E. <br />EFB:mes <br />6628 212TH S.\Y. • LVNNWOOD, WASHINGTON 98036 •(206) 771�6666 <br />FACSIMILE (206) 771-6558 <br />