My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1611 SE EVERETT MALL WAY 2018-01-02 MF Import
>
Address Records
>
SE EVERETT MALL WAY
>
1611
>
1611 SE EVERETT MALL WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2022 3:01:48 PM
Creation date
2/10/2017 2:03:12 AM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1611
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />PUBLIC WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street <br />4wrr <br />Everett WA 98201 <br />425-257-8800 <br />Receipt 71 16�39ee2 <br />x Cost of Work Order $2579.00 <br />Cost of Service Order <br />Contact Person Jay Duffy <br />Requested By George Hanson <br />Property Owner (name) JJMD2 <br />Charge Cost to (name if different than owner) <br />Address 9394 Old Hwy 99 N Rd. City <br />decieve <br />JUN 1 R 2010 <br />PUBLDat Pl'a�YRI S(o i <br />Work Order;# <br />Service Order "" <br />Telephone Y <br />Date of Request 06/07/10 <br />Burlington, WA Zip <br />Installation Location 9300 W Mall Dr. <br />Installation type/description/size%etc. 8" on 12" tap & connection after pressure & purity test. . <br />Contractor to excavate, shore & restore. #1 <br />The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />date to allow for scheduling and harts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />.,,...,,,,n If. A*rn T AnrFR MAV F-TAVFASIX <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />TOTAL <br />1787.00 <br />418.00 <br />330.00 <br />44.00 <br />$2579.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Kirk Brooks <br />Gordon Witcher <br />Matt Welborn <br />Mike Ward <br />Cliff Lindman <br />Randy Allen <br />Prepared by: Mike Ward ' UUt -V Date Estimate Prepared 06/10/10 <br />Accepted by: Representing <br />ESTIMATE GOOD FOR 6 MONTHS <br />10f 1 <br />S:\NCommon\clerical\Cosiest\2010\9300 W Mall DOOC (/ [ <br />v <br />
The URL can be used to link to this page
Your browser does not support the video tag.