My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15 SW EVERETT MALL WAY WHIDBEY ISLAND BANK 2016-01-01 MF Import
>
Address Records
>
SW EVERETT MALL WAY
>
15
>
WHIDBEY ISLAND BANK
>
15 SW EVERETT MALL WAY WHIDBEY ISLAND BANK 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 9:08:08 PM
Creation date
2/10/2017 2:12:48 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
15
Tenant Name
WHIDBEY ISLAND BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2006 WaY '�gton State Nonresidential Energy Code Comp�'^�ce Po�m <br />! _ , �� <br />' ' — — ReviseCJuly2Wi <br />006 Wnshington Slale NonraSiCen:ial Eneigy CoCe Campliance Porms <br />ProjectAddress Whs�ay Islend Benk Date �/2/2010 <br />Project Info For Building Department Use <br />Cwrett Mell Wey <br />Evecett, WA <br />Applicant Plame: esz n:onice�ea �QQ %- r/ � 3 <br />Applicanl Address: e25 Piaher sena, e�ru�:aeon, wn 90233 <br />Applicant Phone: aeo-vs�-sosa <br />Project i�escription ❑ New Bullding ❑ Addition ❑� Alieration ❑ Change of Usa <br />❑� Prescriplive ❑ Co;nponent Performance ❑ Seatlle EnvSid <br />Compliance Option (See Decision Flowchart (over) for qualifications) � Systems Analysis <br />Space Heat Type � Electric resis�ance � All other (see over for definitions) <br />Total Glazing Area Eleclronic verslon: these values are automatically taken (rom ENV-UA•1. <br />Glazing Area Calculation Uough opening) Gross E�Aerior <br />Nota: Botow grado walts may Ge inclu�ed in iho <br />(verlical 3 ovorhd) divided by Wall Area limes 100 equals % Glazing <br />Gross Ealerior Wall Area if Ihay aro Insulaled Io � 2 5. 0 — 4 3 0 5. 0 X 1 �� = 16 . 8`•k <br />Ihe levol raquired lor opaquo walls. ' <br />� yes Check hore il using Ihis option and if proJecl meets all reqWrements lor the ConcrelelMasonry <br />Concrete/Masoru � t10R Oplion. See �ecision Flowchan (ovar) lor qualilications. Enter requiremonts lor each qualilying <br />y p Q no assembty below. <br />Q yes Check hera il using seml�heated path end if project meets ell requlrements for sert�i•healed spaces <br />I S0CTl1-HedtOC� PBttl es defined In sactlon 1310. ReqWres mher luel heating and qualifying thertnostat. Only wall <br />Q no Insulallon requlrement Is reduced (2006 change). Only avallebla in prescdptive pnlh. <br />1. Assemblies with matal framing must comply wilh overall U-(actors <br />Notes: <br />�� ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.