Laserfiche WebLink
everett <br />� <br />��ISPE?CTION REPORT <br />Address ��_� �� �j���� ��L� <br />Contracto ����(,L /'CfU,� y —' <br />Owner <br />Date %— '— �f'� <br />TYPE OF INSPECTION REQUESTED <br />❑ BLDG: Pmt. No. �MECH: Pmt. <br />❑ ELEC: Pmt. No. PLBG: Pmt. <br />❑ Temp. Elect. ❑ Masonry <br />❑ Footin 9 <br />❑ Foundation ❑ Dryw II, Nailing <br />❑ Ductwork ❑ Reugh-In <br />❑ Wood Stove ❑ Service <br />❑ Gas Piping <br />No. <br />No. �%��('� <br />❑ Consultation <br />❑ Groundwork <br />❑ trucL Slab <br />Final <br />�"�rr�"SVVHL ❑ PARTIAL APPROVAL <br />VIOLATION ❑ CORRECTION REQUIRED <br />❑ Corrections listed below MUST BE MADE befora work can be approved. <br />❑ Please contact inspector and arrange for appointment. <br />❑ Was not able to perform inspeclion. <br />❑ CALL �5 FOR REINSPECTION -- 2q hour notice required. <br />A CERTIFICATF OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br />THE PREMISES PRIOR TO CC�UppNCY. <br />° ��3c _ �� � -8 � I p <br />Inspector <br />Dafe '7 G -ai <br />