Laserfiche WebLink
INSPECTION REPORT <br />Date �- -- .__Permit: <br />E 131 O <br />Contractor: GIYi� <br />Owner: <br />Site Address 2,1 S W V- G <br />TYPE OF INSPECTION REQUESTED <br />ELECTRICAL BUILDING MECHANICAL PL <br />❑Temp Service ❑UFERground ❑Groundwork/Slab ❑G <br />❑ Groundwork ❑ Footing ❑ Rough In ❑ <br />❑ Slab/Conduit ❑ Foundation ❑ Ceiling Grid ❑ O <br />❑ Rough In ❑ Structural Slab ❑ OK to insulate ❑ <br />❑ Service ❑ Framing ❑ Rooftop Units ❑ <br />❑ Grounding ❑ Insulation ❑ Mechanical Final ❑ <br />e111ng Grid ❑ Drywall Nailing ❑ <br />lectrical Final ❑ Shear Nailing GAS PIPE <br />SITE WORK ❑ Root Nailing ❑ Rough In/Service H <br />❑ Footing drains ❑ Ceiling Grid ❑ Rehigeration ❑ <br />❑ Root drains ❑ Building Final ❑ Gas Pipe Final p ❑ <br />OTHER OR CONSULTATION:__._ .- --��o �� _ <br />Wc�,U <br />UMBING <br />roundworklSlab <br />Rough In <br />Ceiling Grid <br />K to insulate <br />Water Service <br />Medical Gas <br />Plumbing Final <br />of Water Tank <br />Rough in <br />HWT Final <br />241 <br />PPROVAL ❑ PARTIALAPPROVAL FINAL APPROVAL THIS PERMIT <br />❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: __—_—-----' <br />❑ CALL (425) 257.8881 FOR REINSPECTION -.24 hour notice required <br />Date: � <br />Inspector: /� �� - _ <br />DAWAR, INC. <br />EIR (10)06) <br />