Laserfiche WebLink
I <br />Date 3 -`7 <br />Application For - <br />PUBLIC WORKS PTMM -T, <br />Print or Type Only <br />Le <br />Owner <br />7/6 S� <br />Mailing Address <br />Public Works Perrot 1 97/, <br />Bldg. Dear.. F' 7 1 S'r). S i <br />Public Works Fee $/ 7�-^ <br />Total Fea <br />Less Appr Fee Paid S <br />Balance Due <br />Phone <br />Applicant Mailing Address City Zip Phone <br />Describe Proposed Work A/H(Ai rrs vi , n iik9�f. rj ea la ,A <br />W <br />i, : iec w"ss (if known) 2/� cSGtl EdEPc Tl /Y>/fL""L liC/A✓ <br />rtlacn Ip;tl, , .i copies of plans for proposed work - Draw to scale and note the following as applicable: <br />• Property Lines • Centerline of street <br />• Outline and dimensions of all existing and • Indicate North <br />proposed structures on the lot • Show any proposed grading changes <br />• Existing and proposed utilities • Show measurements <br />DO NOT WRITE BELOW THIS LINE O <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hrs. in advance - phone 259.881 5. <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and Construction <br />Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424.5555. <br />Apb Oved I r Co SiructDate <br />d7'=-4AMA <br />FINAI N. PE(: I N rDate <br />Approved as Constructed U O <br />everett PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 <br />Phone: 259E%f3s &9—M <br />\01 <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harm- <br />less the City of Everett from any and all claims for damages, costs, <br />expenses, or causes of action that may arise because of installation <br />and maintenance of the improvement or other right-of-way use hereto <br />applied for and further agrees to remove same upon notice from the <br />Cit nd ore ce publp pej fy damaged thereby. <br />Ignature ofAVicant _ Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN <br />180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO <br />BE DILIGENTLY PURSUED TO COMPLETION. THIS PERMIT MAY BE <br />CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS <br />PROJECT OVER 90 DAYS DURATION. <br />