Laserfiche WebLink
Site <br />ELECTRICAL <br />❑ Temp Service <br />❑ Groundwork <br />❑ SIab/Conduil <br />❑ Rough In <br />❑ Service <br />❑ Grounding <br />❑ Ceiling Grid <br />❑ Electrical Final <br />SITE WORK <br />❑ Fooling drains <br />❑ Roaf drains <br />INSPECTION REPORT <br />Date _I_` 1 � _ Permit: � �- \_�JC(J �O`1_ <br />Contractor. �Q�J ��i�( <br />��-/�/� V -- <br />Owner: U �JVI/1�� _ __ <br />TYPE OF INSPECTION FEQUESTED <br />BUILDING MECHANICAL <br />❑ UFER ground ❑ Groundwork/Slab <br />❑ Footing � Rough In <br />❑ Foundation ❑ Ceiling Grid <br />❑ Siructural Slab ❑ OK to insulale <br />� Framing ❑ Rooltop Units <br />� Insulation ❑ Mechanical Final <br />❑ Drywall Nailing <br />❑ Shear Nailing GAS PIPE <br />❑ Roof Nailing ❑ Rough In/Service <br />❑ Ceiling Grid ❑ Relrigeration <br />❑ Building Final ❑ Gas Pipe Final <br />C_ i 7, r_ �f 7/.� 9 <br />OTHEFi OR CONSULTATION: <br />r Slab <br />� Rough In <br />❑ Ceiling Grid <br />❑ OK fo insulate <br />❑ Waler Service <br />�Medical Gas <br />Plumbing Final <br />Hot Waler Tank <br />❑ Rough in <br />❑ HWT Final <br />❑ APPROVAL ❑ PARTIALAPPROVAL FINALAPPROVAL <br />❑ OK FOR T,C.O. ❑ CORPECTION REOUESTED <br />❑ OK FOR C.O. ❑ VIOLATION <br />❑ UNABLE TO PERFORM INSPECTION: _ __ ___ _ <br />❑ CALL (425) 257-8881 FOR REINSPECTION — 24 hour notice re�ulred <br />Inspecfor. �/ Y v Date: �_ � / C <br />EIR �1ON6) TABAR, INC. <br />