My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
228 SW EVERETT MALL WAY GOODWILL 2018-01-01 MF Import
>
Address Records
>
SW EVERETT MALL WAY
>
228
>
GOODWILL
>
228 SW EVERETT MALL WAY GOODWILL 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2019 9:34:33 AM
Creation date
2/10/2017 2:25:28 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
228
Tenant Name
GOODWILL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK <br />Work to be performed at: <br />Goodwill <br />228 SW Everett Mall Way <br />Everett, WA 98204 <br />"The IVorthwest Flat and Low Slopc Specialists" <br />Diamond Roofing, Inc. (DRI) hereby agrees to furnish materials and perform necessary la6or to: <br />✓ <br />✓ <br />✓ <br />✓ <br />✓ <br />✓ <br />Remove existing failed black TPO roofing material on entire surface of roof and haul away. <br />Existing TPO material has to be removed due to water-damaged flat rigid insulation board <br />under failed black TPO roQfing material. Flat insulation board is water-damaged due to <br />years of slow leaking due to cracks and breaches through iailed TPO roofing material. <br />DRI will remove and haul away all existing metal plates and screws. <br />DRI will remove insulation board on entire surface of roof that is not bowed (water- <br />damaged) and set aside for re-installation.DRl will haul away all water-damaged/moldy <br />insulation board. <br />DRI will replace all metal fluted panels that are not structural sound due to advanced rust- <br />through with like new fluted metal panels.DRl will treat all mold/mildew with bl�;ach <br />solution. <br />DRI will install new Sarnavap self-adhering vapor barrier over entire surtace of roof deck. <br />DRI wili install additional flat rigid polyisocyanurate insulation board on top of existing rigid <br />insulation board in order to meeF current insulation code required by City of Everett. Seam <br />pattern of new insulation board will offset seam pattern of existing rigid insulation board. <br />New insulation board will be anchored to fluted metal substrate with #15 Sarnafil metal <br />screws and Sarnafil metal insulation plates. <br />DRI will meet with city inspectors as required throughout entire process. <br />�� <br />
The URL can be used to link to this page
Your browser does not support the video tag.