Laserfiche WebLink
INSP�CTION REPORT C 1 � <br />Date 7 / � �__ <br />f— <br />`6___ <br />ELECTRICAI <br />❑ Temp Scrvice <br />❑ Groundwork <br />❑ SlablConduil <br />❑ Rough �n <br />❑ Service <br />❑ Grounding <br />Q Ceiling Grid <br />❑ Eleetrieal Final <br />SITE WORK <br />� Footing drains <br />� fiool drains <br />TYPE OF INSPECTION REOUESTED <br />BUILDING <br />❑ UFER ground <br />Q Footing <br />❑ Foundation <br />❑ StrucWral Slab <br />� Framing <br />❑ Insulation <br />❑ Drywall Nailing <br />❑ Shear Nailing <br />❑ Rool Nailing <br />�� ling Grid <br />Ilding Final <br />MECHANICAI <br />❑ Groundwork/Slab <br />❑ Rough�.^. <br />❑ Ceiling Grid <br />❑ OK to in-ulate <br />❑ Fooltop U�,�,; <br />❑ Mechanical Pinal <br />GAS PIPE <br />❑ Rough InlService <br />❑ Fielrigeration <br />❑ Gas Pipe Final <br />PLUMBING <br />❑ GroundworWSlab <br />❑ Aaugh In <br />❑ Ceiling Grid <br />❑ OK lo insulate <br />� Water Service <br />❑ Medical Gas <br />❑ Plumbing Flnal <br />Hot Water Tank <br />❑ Rough in <br />� HVJT Final <br />OTHER OR CONSULTATION: __ _ _ _ _._ _ <br />�APPROVAL ❑PARTIALAPPROVAL FINALAPPROVALTHISP.�RMIJ <br />❑ OK FOR T.C.O. ❑ CORRECTION REOUESTED `I X I <br />� OK �OR C.O. � VIOLATION y,` <br />�] UNABLE TO PERFORM INSPECTION: _. _ <br />❑ CALL (425) 257•8881 FOR REINSPECTION —24 haur notice requlred <br />Inspector: <br />EIR pOlOfi) <br />Date: I — I <br />7ABAP. INC. <br />