Laserfiche WebLink
' CLOSED CM WORK ORDERS REPORT �.II �IO`� <br />Total Utility Maintenance Management System <br />09/07/1997 Page 1 <br />------------------------------------------ <br />Date Range :12/03/1900 - OS/20/1997 <br />CM Work Order Range :1001091070001 - UT0021-35- Pattern :7101196730242 <br />Item Range :<Blank> - WVL3694L05 Pattern :* <br />Program ALL Function ALL Activity ALL <br />______________________---------- ------- <br />-------------- ------------- <br />CM WORK ORCER ID: 7101196730242 Title: TAP 228 Si4 EVERETT MALL WAY <br />« DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: WML2484B04 -- WATER MAIN LINE <br />Location ID: -- <br />Program 710 Function 119 Activity 673 <br />Date Completed: 08/O1/1997 <br />O�erall Craft: <br />Issued: 07/21/1997 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID Name <br />Issued by: GJ Assigned to: fiBA <br />Priority: Travel Time: 0.00 ;ir. <br />----- ------ --------------------- <br />WST AGE ALLEN, GARY E. <br />UL DMJ DOUCETTE, MARK J <br />SUP2 GJ GARZA, JOHN.(NMI) <br />HEO SR SIERRA, RAMON (NMI) <br />UL SWU STENSETH, WOB URT <br />Materials: <br />ID <br />COUP46047147 <br />N/A <br />N/A <br />P7PE46055047 <br />Planned Hrs Actual Hrs <br />--- ----------- --- <br />0.00 8.00 <br />0.00 8.00 <br />0.00 6.00 <br />0.00 4.00 <br />0.00 8.00 <br />Total Labor Cost: <br />Description <br />------------------------------ <br />COUPLING 8" MJ X MJ DI SLEEVE <br />8" MJ KIT <br />BLEACH <br />PIPE 8" TYTON JOINT DI <br />Cost <br />170.96 <br />126.24 <br />155.10 <br />81.48 <br />127.36 <br />661.14 <br />Date ;; Used Cost <br />08/O1/1997 3 155.70 <br />08/O1/1997 6 150.00 <br />OS/O1/19�7 � 2.64 <br />08/O1/1997 20 192.00 <br />Total Material Cost: <br />Vehicles: <br />ID Description Hours Cost <br />------------ ------------------------------ ------ ---------- <br />V0017 94 FORD AEROSTAR VAN 6.00 34.80 <br />Vi137 84 GMC BOOM TRUCT' 5 TON 9.00 84.80 <br />V2150 87 FORD 2 TON W/CRANE 8.00 4%.20 <br />Total Vehicle Cost: 166.80 <br />SQ0.34 <br />3y.� ,�t <br />�9ork Description: <br />--------------------------------------------------------------------------- <br />2-S" TAPS AND FINAL CONNECTIONS. <br />COST EST DONE <br />