Laserfiche WebLink
FRONTIER BANK <br />— Project No. 91266 <br />; By: Hal Jensen, P.E. <br />— Single Swale - Required length calculadon <br />_ Total Pavement = 108,900 S.F. <br />Everett requirement is 100 L.F. for the first 10,000 S.F. of Pvm't. <br />Plus 1 L.F. for each addidona1400 S.F. of Pvm't. <br />OR <br />200 L.F. for the first 50,000 S.F. of Pvm't. <br />_ Plus 1 L.F. for each additiona1800 S.F. of Pvm't. <br />' Calc. (Area _ 10,000) / (400) + 100 = 347 L.F. <br />_ or (Area - 50,000) / (800) + 200 = 274 L.F. <br />� <br />e <br />