Laserfiche WebLink
COST ESTIMATE BHEET <br />Receipt # <br />Cost of Work order <br />PUBLIC WORKS DEPARTMENT <br />UTILITIES DIVISION <br />2300 CEDAR STREET <br />EVERETT, WASAINGTON 98201 <br />(206) 259-8800 <br />Date Paid <br />Work Order # <br />x Cost of Service Order $ 13,580.00 Service Order # <br />Contact Person: <br />Requested By: Mollv <br />Property Owner (name) Frontier Bank <br />Charge Cost to (name if different than owner) <br />Telephone # 346-0700 <br />Date of Request 9/18/92 <br />Address 623 Ever reen Wa City Everett 'Lip 98201 <br />Installation Location 330 SW Everet.t Mal� Wav <br />Installation typz/description/size/etc. Sawcut excavate install 6" <br />fire service and restore area <br />[X] The following estimate is based upon the Utilities Division <br />providing all labor, equipment, materials, restoration, and final <br />hook-up. <br />[] The following estimate is based upon the Street Division work group <br />providing al) labor, equipment, materials and restoration to <br />property. <br />Whenever the eatimated coet ia not aufficient to cover the total expenee for labor, <br />material, equipment rental and administrative costs, the deficit ahall be charged to <br />the property for which such inetallation was made and the owner L•hereof, and provided <br />further, that any �_xceae payment shall be returned to the per:son applying for the <br />inetallation. <br />itemizad Cost Eatimate: <br />Labor & Overhead <br />Material <br />Equipment Rental <br />6144.00 <br />4283.00 <br />1312.00 <br />Surface Restoration 1000.00 <br />Total <br />13,580.00 <br />cc: Bldg. Permit Counter <br />Clair Olivers <br />Tom Thetford <br />Don Weitkamp <br />Kirk Brooke <br />Gordon Witcher <br />o. Don Wahl <br />Dan Low�ll <br />Stan Mitchell <br />Prepared by <br />Accepted by Representing <br />R�vN�d OB/16/91 <br />Pl527CST (PC:9/21/92) <br />