My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
530 SW EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
SW EVERETT MALL WAY
>
530
>
BASE FILE
>
530 SW EVERETT MALL WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2022 9:51:30 AM
Creation date
2/10/2017 2:48:46 AM
Metadata
Fields
Template:
Address Document
Street Name
SW EVERETT MALL WAY
Street Number
530
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT SYt00000000000000000001 i 5-23-94 i 2:29PM <br />2062562922�_._ 2066724244;# 6 <br />Wayne Wentz <br />June 14, 1994 <br />Page 4 <br />The developer's total traffic impact fees to City of Everett programmed improvement projects <br />would be S 22,230.47. In addition, the developer would be responsible for the following <br />fl'ontage and access improvements: Full street improvements curb, gutter and sidewalks on <br />5th place West from Everett Mall Way south along site frontage; upgrade existing driveway <br />geometries of the Everett Mall Way/5th Place W intersection to local street access geometdes <br />(pavement width yet to be decided by City of Everett); dedicate ROW to City of Everett for <br />the potential extension of 5th Place W to the south; sidewalk, curb -and -gutter on the out side <br />of 5th Street SW along the site frontage; and, new curb cuts and driveway accesses onto <br />Everett Mall Way to City of Everett design standards. <br />Padestrism •----• -tea Ftionta4e ImnrovemMts: The proposed full access onto Everett <br />Mall Way satisfies desirable sight distance requirements per AASHTO for the posted 40-mph <br />speed (over 600 feet clear is both directions). The proposed right -nun Wout driveway is <br />located 200 feet east of 5th Street SW and has over 600 feet of clear sight distance to the <br />west. Along the site frontage, Everett Mail Way has already been improved to its ultimate <br />road section (6-lanes plus center turn lane) with curb, gutter and sidewalks on both sides. <br />The following streetlsafety improvements are recommended to ensure the safety of vehicular <br />and pedestrian Ui is in the project vicinity. <br />1. Construct the Everett Mall Way site access driveways to City of Everett and WSDOT <br />design standards. <br />2. Install stop signs and stoplines per MUTCD standards at access driveways, with <br />standard "right -turn. only" signing and pork -chop island installed at west driveway onto <br />Everett Mall Way (SR-99). <br />th <br />elchair <br />3. from site frontage on Evct direct, safe and �etttMali Way tpedestrian o store entrances and between store <br />entrances. <br />4. The fits access site driveway onto Everett Mall Way should be aligned directly <br />opposite the existing retail access driveway on the north side. <br />aRAFoa <br />OH@UL7L^ HV% <br />
The URL can be used to link to this page
Your browser does not support the video tag.