Laserfiche WebLink
D[C 2 7 1988 <br /> December 22, 1988 <br /> CITV OF <br /> David Behar <br /> Spieker Partners everett �I <br /> P,O. Box 97022 <br /> Be11eVUe� WA 98009-9:'22 cirr HALL • 2598]55 I <br /> EVEFETT.WASMINGTOY <br /> BBZOi I <br /> Dear Mr. Pehar: i <br /> i <br /> RE: Southpoint Plaza Shoppinq Center Driveway Revisions � <br /> SEPA �121-83 I <br /> This letter is in response to the City's review of your proposal to <br /> revise the site plan for Southpoint Plaza Shopping Center to add an <br /> additional driveway on Evergreen Way and to add a restaurant building <br /> (Building E) • The site plan by Doug Mulvanny Architects with the ��� <br /> last revision dated 11-11-88 is approved based en compliance with all il <br /> of the conditions of approval on the Determinaticn of i <br /> Non-Significance issued for SEPA #21-83 and the driveway revisions <br /> listed in the letter to you dated November 30, 1988 from Robert <br /> Landles. <br /> If you have any questions regarding this letter, please contact me at <br /> 259-8731. <br /> Sincerely, <br /> DENNZS L. DERICKSON, AICP <br /> PLANNING DIRECTOR <br /> 'y�Jp_-,�V,;"� � . � <br /> Mary ¢"unningham <br /> Associate Planner <br /> cc: Larry Crawford <br /> Tim Tyler <br /> � I <br /> � <br /> � <br /> I <br />