Laserfiche WebLink
/ <br /> Participation in a future voluntary emnloyee carpool program is <br /> required, <br /> 9. A fire hydrant is required within 200 driving feet but not closer than <br /> 50 feet of every structure. All fire systems shall be built within the � <br /> standards established by City and State codes, and must be approved by <br /> the Fire Department. i, <br /> I <br /> 10. Specifics on the external commerical signing requirements pr000sed for � <br /> the shopping center shall be submitted to and approved by tha Planning I <br /> Department prior to issuance of occupancy permits. <br /> 11. Exterior lighting shall be designed per I.E.S. standards with the <br /> luminance distance to minimize light and glare to extent feasible on <br /> contiguous properties. <br /> 12. Construction of the shopping center must be coordinated by the � <br /> applicant with the Snohomish County P.U.D. and General Telephone to <br /> insure provision of aaequate electrical and telephone service to the <br /> development. <br /> 13. Increased noise will be generated by automobile and truck traffic. I <br /> Operation of the shopping center must comply with State (WAC 173-60) <br /> and 1oca1 Noise Code requirements (Ordinance 4k534-78) . <br /> 14. Truck loading and unloading areas adjacent to the residential uses to <br /> the northeast of the shopping center shall be designed with enclosed <br /> loading docks: Walls of the loading docks shall be sufficient to 'i <br /> reduce noise to meet Noise Cade requirements. �, <br /> 15. Landscaping of parking areas must be provided in compliance with Zoning. � <br /> Code requirements (Section • 19.40.050) and the City's Design and <br /> Construction Standards ::n�i Speci.fication (Section 1.13) . Screening of <br /> all rubbish disposal areas is required. <br /> A detailed landscaping plan must be approved by the Planning Department � <br /> prior to the issuance of building permits. Occupancy permits shail not ' <br /> be issued until required landscaping is installed or bonded for. <br /> 16. Phasing of the project construction is not proposed at this time. Any <br /> proposed phasing of requirements included herein must be approved by <br /> the Planning Department. . <br /> Construction must occur during rhe hours of 7:00 A.M. and 7:00 P.M. ; <br /> during construction City streets are to be kept clear of dirt and <br /> debris, and all truck traffic to and from the site within the City of <br /> Lverett shall be on arterial street unless otherwise approved by the <br /> Public Works Department. <br /> INFORMATION FOR DEVELOPER: <br /> 1. " Performance guarantees are required for all improvement in the <br /> right—of—way, storm drainage and landscaping. <br /> 2. A one (1) year guarantee is required on the public i.mprovement and <br /> landscaping 'for an amount not less than 10� of the cost of construction <br /> and shall run for one (1) year from date of issuance of the first <br /> Occupancy Permit for the project. <br /> 4�� <br /> I' <br />