My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10115 EVERGREEN WAY PAY N PAK 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
10115
>
PAY N PAK
>
10115 EVERGREEN WAY PAY N PAK 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 9:00:41 AM
Creation date
2/10/2017 7:06:08 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10115
Tenant Name
PAY N PAK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC IJORKS DEPARTTfENT <br /> UTILITIES DIVISION <br /> 3200 CEDAR STREET <br /> EVERETT, WASHINGTON <br /> �JST ESTIMATE SHEET <br /> ReGuested by G. Witcl�er Date of Request 4-18-85 <br /> Address En,ineerin� Phone 259-8811 <br /> Installation Location Mall Wav & Everareen Way - (Southpoint,� <br /> Installation type/description/size/etc._ One hydrant installatio�, 2 - water feeds, <br /> teuporarv patch and compaction for hvdrant installation onlv <br /> Total F.stimated Cost $7,366.00 <br /> This estinate reflects the Utilities Division having to Saw cut. . .. . . . . . . . . <br /> provide labor, equipment and materials to conplete the above Shoring. . . . . . . . .. . . X <br /> r�entioned installation including, but not limited to, the Excavation. . . . . . . . . X <br /> items identified to the right. Any labor and/nr equipment Backfill. . . . . .. . . . . <br /> provided by the contractor to facilitate the �uork by the City Compaction. . . . . . , . . X <br /> water department �aill be reflected in a refund to the person Temporary Patch. . . . X <br /> malcing the deposit. Permanent Patch. . .. <br /> Furnish double check val��P assembly <br /> for temporary water supply. . . . . . <br /> Final hook-up after purity <br /> and pressure testing. . _X_ <br /> (Whenever the estimated cost is not sufficient to covar the total expense for labor, <br /> material, equipment rental and administrative costs, the deficit shall be charged to the <br /> property for which such installatio❑ �oas made and the owner thereof, and provided <br /> further, that any excess payment shall be returned to the person applying for the <br /> installation.) <br /> Itemized Cost Estimate: <br /> Labor & Overhead $2,463.00 0. IJahl 259-8822 <br /> Material $4 096.00 Estimate Prepared By Phone # <br /> Equipment Rental $ 636.00 <br /> Surface Restoration $ 171.00 cc: Larry Callahan <br /> TOTAL ESTII•iATE $7,366.00 Don lJeiticamp <br /> Larry Cra�aford <br /> Bob Chervenell <br /> IIud Krom <br />
The URL can be used to link to this page
Your browser does not support the video tag.