My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10115 EVERGREEN WAY PAY N PAK 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
10115
>
PAY N PAK
>
10115 EVERGREEN WAY PAY N PAK 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 9:00:41 AM
Creation date
2/10/2017 7:06:08 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10115
Tenant Name
PAY N PAK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
182
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� �j � � c� odr� � <br /> JUL 16 igg5 <br /> Keyel & Associates inc. <br /> ......................................................._.._._.. <br /> CITY C1F EVERETT <br /> July 1 2 , 1985 Pub!Ic Ylqr;,; pept. <br /> A1 Theal, P .E. , Director <br /> Department of Public Works <br /> City of Everett <br /> City Service Center <br /> 3200 Cedar Street <br /> Everett, Wa�hington 98201 <br /> Re: 9800 Evergreen Plap <br /> Dear A1: <br /> I have just learned that Larry Crawford t,�ill be out c,� to��rn f.or <br /> another couple of weeks. Since I also will not be availaUle, I <br /> would like to ask your help in expediting approval of our oifice <br /> frontage improvement project. <br /> The plans were submitted to Public Works in February, however, <br /> apparently little, if any, progress was made. We have p].anned to <br /> jointly participate with the South Point project under the same <br /> contract. The South Point plans were approved yesterda��. An <br /> inquiry by our office }�esterday as to the approval status of our <br /> plans was met with something less than a definitive response <br /> other than the RID is now in place. <br /> This is very disturbing to say the least. We are tr}'ing to <br /> finalize bid documents for the combined improvement so as to <br /> have the projects completed before inclement_ Wa_ather. sets in, <br /> with construction planned to commence in a few weeks. <br /> I 'n sorry to have to prevail upon your busy schedule, however, <br /> time is of the essence. I will appreciate it if you o�ill contact <br /> Jerry Krell, our operations manager, in my absence. <br /> Respectfully r�sted, <br /> C',���1?�� <br /> Arnold R. Kegel, F. . � <br /> President <br /> ARK/ph <br /> CRD28 <br /> ENGINEERS • SIDRVEYORS • PLAidP1ERS <br /> E800 EVER(;REEN WAY (U.S. 991, EVtRETT,WASHINGTON 98204 • PHONE (206) 353�1119/775�5424 <br />
The URL can be used to link to this page
Your browser does not support the video tag.