My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10115 EVERGREEN WAY PEP BOYS 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
10115
>
PEP BOYS
>
10115 EVERGREEN WAY PEP BOYS 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2017 7:08:48 AM
Creation date
2/10/2017 7:08:24 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10115
Tenant Name
PEP BOYS
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c .9 <br /> GHAV <br /> CIVIL ENGW E[RING,LANL PLANNING,SURVEYING,ENVIRONMENTAL SERVICES <br /> mP � ����Z <br /> . <br /> � ' i . = Augusc 27, I997 <br /> �s°4��o���N�t� <br /> Mr. Steve Miller <br /> Citp of Everett <br /> Building Department <br /> 3200 Cedar Sveet <br /> Everett, WA 98201 <br /> RE: Tenant Improvement for the Pep Boys Project <br /> 10115 Evergreen Way, F,verett, Washington <br /> Our Job No. 6162 <br /> Dear Mr. Miller: <br /> On behalf of Pep Boys, Barghausen Consulfing Engineers, Inc., respectfully requests that the Ciry of Everett <br /> ini6ate review of the enclosed tenant improvement application. Approval of this application will allow Pep <br /> Boys to conswct ihe proposed improvements to ihe existing vacant Ernst building at the above-referenced <br /> locauon. Enclosed for your use are the foilowing materials: <br /> 1. Four copies of the civil site plan. <br /> 2. Three complete sets of construcGon drawings. <br /> 3. One check in the amount of$1,547 to cover plan check fees. <br /> 4. Completed applica6on. <br /> It is our understanding that the enclosed materials comprise a complete tenant improvement applicafion. <br /> However, if you require any additional information or have any quesfions regarding the enclosed, please do <br /> not hesitate to contact me at ihis office. <br /> �Y, <br /> John Ilingse <br /> ' ct Planne•r <br /> JE/kn <br /> 6I62C.003 <br /> enc: As Noted <br /> cc: Mr. Mike Palrner, Pep Boys <br /> Mr. Michael Boulton, Reeves Associates Architects, Inc. <br /> Mr. Jay S. Grubb, Barghausen Consulfing Engineers, Inc. <br /> 182�5 72ND AVENUE SOUTH KENT.WA�8032 (425)251-6222 (425)251-8782 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.