My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10121 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
10121
>
BASE FILE
>
10121 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 10:27:30 AM
Creation date
2/10/2017 7:24:10 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10121
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PU3LIC IJORKS DEPAR'C�tEi <br /> UT[LITIES DIVISlOY <br /> 3200 CEDAR STc�Ec,T <br /> GV6RETT, WASHI�GTO\ <br /> COST ESTIPI�ITB SHEE1' <br /> ReGuested by G. Witcher Date of Request 4-18-85 <br /> Address En�ineerin� Phone 259-SSI1 <br /> Installa[ion Location �lall Wav & ::ver2reen Way - (Southpoint) <br /> Installation type/description/size/etc. One hydrant installa.-ion, 2 - water Eeeds, <br /> temoor�rv natcn and cor�oaction Eor hvdrant install�tion onlv. <br /> Total Estimated Cost $7,366.00 <br /> This estinate reflects the Utilities Division having to Saw cut. . . . . . . . .. . ._ <br /> provide labor, equipment and materials to cornplete the above Shoring. . . . . . . . . . . ._X_ <br /> nentioned installation including, but not limited to, the Excavation. . . . . . . . ._Y_ <br /> items identified to the right. Any labor and/or equipment Backfill. . . . . . . . . . . <br /> provided by the contractor to facilitate the iuork by the City Compaction. . . . . . Y_ <br /> water departr�ent will be reflected in a refund to the person Temporary Patcn. . . ._.l'_ <br /> ma;:in� the deoosit. Permanent Pstch. . . ._ <br /> Furnish double check valve assembly <br /> for temporary water �upply. . . . .._ <br /> Final hook-up after purity <br /> and pressure Cesting. . ._�_ <br /> (!Jhenever the estimated cost is not sufficient to cover tlie total espense for labor, <br /> material, equipment rental and administrative costs, the deficit shall be charged to the <br /> property for which such i.nstallation ��as made and the owr.er thereoE, and provided <br /> further, that any excess payment shall be returned to the person apply^_ng :or the <br /> installation. ) <br /> Itemized Cost Estimate: <br /> Labor & Overhead S2.4fi3.00 0. lJahl _ 259-8822 <br /> Platerial S4,096.00 Estimate Prepared By Yhone li <br /> Equipment Rental S 636.00 <br /> Surface Restoration $ 171.00 cc: Larry Callahan <br /> TOTAL ESTIhiATE S7,36Ci.0U Don lvei[:camp <br /> Larry Crawford <br /> Bob Cherver�ell <br /> Bud Krom <br /> �� C� X <br /> :��T-��Go v3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.