My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10121 EVERGREEN WAY QUALITY SEWING AND VACUUM 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
10121
>
QUALITY SEWING AND VACUUM
>
10121 EVERGREEN WAY QUALITY SEWING AND VACUUM 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 11:05:25 AM
Creation date
2/10/2017 7:50:38 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10121
Tenant Name
QUALITY SEWING AND VACUUM
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
; {- <br /> FfG 07-22-2008(TUE) 14:28 <br /> t�i.H. kEG-i Qi';489 <br /> CT i <br /> FERMIT No.0607041 <br /> ErT 1 r'1C �2b7.77 <br /> Ti 3�`E.7.7? <br /> (425)257-8810 ��NECK :2E7.77 <br /> Plan Check No.: 80807-041 <br /> Application Date: 7/22/2008 <br /> Tenant: QUAIITY SEWING 3�VACUMN <br /> Owner: SOUTH POINT PLAZA LI_C <br /> Job Address: 10121 L=VERGREEN WAY#15 <br /> Proposed Use: <br /> Description of Work: TI-QUALITY SEWING 8 VACUMN <br /> Plan Check Fee Paid: $267.77 <br /> The building pertnit application for the above-rcferenccd projcct is bcing conditionally accepted for filing <br /> pending the detcrmination of its completcness. <br /> If thc City revicw setermincs that any addi�ional land use approval or any additional infonnation is <br /> requircd to co;nplete your building permit application, it�vill br,necessary to su6mit this additional <br /> infonna�ion or acyuire the additional land use approval prior to your appiication being considered complete <br /> for filing. If no other Innd use approval or additional infonnation is required,your building pertnit <br /> applicatian will bc considered lilcd as nf this date. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE QF APPLICATION. <br /> � <br /> / <br /> ' ���/�� �� � <br /> G "7 - 22� (� <br /> Signaturc Dace <br /> FILE COPY <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.