Laserfiche WebLink
I ! <br /> � <br /> � I <br /> ' DOUGLAS MULVANNY Architects FAX'869-2563 <br /> , <br /> �` MU�VANNY �� LEE °°�9'as ""�'"a""v <br /> Bi f�ssoCi¢tes Jerry Quinn Lee <br /> 12200 Northup Way • Bellevue,Wa 98005 Gregg Percich <br /> Robert Kroese <br /> March 28, 1990 <br /> Mr. Ben Edwards <br /> City of Everett <br /> Public Works Department <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> Re: Pacific Fabrics <br /> South Point Plaza <br /> Everett, Washington <br /> DM/A #89-114 <br /> Dear Mr. Edwards, <br /> Enclosed please find two (2) complete sets of drawings for the above men- <br /> tioned project. Please note the following revisions per our meeting on <br /> Monday, March 26, 1990: <br /> 1. The metal plate at the display case has been deleted. See details 11 & <br /> 12 on Sheet A-3. <br /> 2. The contractor has determined that insulating the canopy areas and <br /> providing a wet sprirkler system will reduce costs. Note changes on <br /> wall section on Sheet A-4. The resulting difference in temperature <br /> between the display case and the canopy will provide the air flow <br /> necessary to vent the display case. <br /> 3. Please note the intended path of the downspouts and overflow scupper <br /> added to wall section #3 on Sheet A-4. <br /> 4. Please see the attached specification sheet on the roofing tiles for <br /> verification with previously submitted structural calculations. <br /> 5. Electrical drawings have been revised to show the revised office area <br /> and night lighting as discussed. <br /> 6. See detail 15 on Sheet A-6 for mechanical equipment curb detail . <br /> Please let me know of any further questions you may have. <br /> Sincerely, <br /> MULVANNY-LEE & ASSOCIATES <br /> �� - ' �--.�-`?-��e,--_ <br /> Dwight E.jH llar <br /> DEH/vcr <br /> cc: David Behar, Spieker Partners <br /> Don Cunningham, SSG Corporation <br />