Laserfiche WebLink
everett INSPECTIO�1 REPORY <br /> � Address /D,�D� � ,l ���� <br /> Contractor �� �' <br /> � �Owner � <br /> Date ��� <br /> �� <br /> TYPE OF INSPECTION REQUESTED <br /> ❑ BLDG: Pmt. No. ❑ MECH� Pmt No. <br /> �.ELEC: Pmt. No. ��� PLBG: Pmt. No. <br /> � ❑Temp. Elect. ❑ Framing ❑ Gas Pipinc� <br /> ❑ Footinc� ❑ Drywall, Nailing ❑Consultation <br /> ❑ Foundation ❑ Shear Nailing ❑ Groundwork <br /> ❑ Ductwork �Grid ❑Struct.Slab <br /> ❑ Wood Stove ❑ Rough•In ❑ Final <br /> ❑ Masonry ❑ Service � <br /> I PPROVAL /ls ❑ PARTIAL APPROVAL <br /> ' L� VIOLATION N��� ❑ CORRECTION REQUIRED <br /> - ��~ � ❑ Corrections listed belew MUST BE MADE before work can be approved. <br /> ❑ Please contact inspector and arrange for appointmeN. <br /> ❑Was not able to perform inspection. <br /> ❑ CAIL 259-8810 FOR REINSPECTION — 24 hour rotice required. <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED ON <br /> THE PREMISES piilOR TO OCCUPANCY. <br /> ', ���vs� �'_��� <br /> , <br /> _�L�rr� ��,vs7st /;.� �C, S�a-�� <br /> 1. � t� <br /> /j/li� Date –�/_1"—L- <br /> Inspector � <br />