Laserfiche WebLink
e <br /> �Y µ� <br /> D. SECTIONS AND ELEVATIONS <br /> � Usab!e space under floors <br /> �� � Guazdrail consWction <br /> r� Wall assemblies and construction (area/occupancy, separation) <br /> q �..� Floodceiling assemblies and construction <br /> � � Roof/ceiling assemblies and construction <br /> �8e Fire blocking <br /> � � Parapets per 1710 <br /> �� Insulation per calculations or Energy Cocle <br /> �y� _�_ Below grade walls <br /> x Siab edge <br /> o � ty Wall <br /> Floor <br /> Q�g Roof <br /> �H� � Wall bracing for partial heigtit walls <br /> Corridor section <br /> N <br /> g�� <br /> � � E. REFLECTED CEILiNG PLAN <br /> `�w <br /> � Light fixtures and wattages <br /> Lighting energy budget calculations <br /> Draft stops <br /> Attichoof access <br /> i Exit signage and lighting (emergcncy power) i <br /> I: �� <br /> F. ROOF k'LAN J <br /> � ��'� ' u Roof access [stair 3306(n)] and mechanical per UMC 1 <br /> � Ventilation <br /> I <br /> Rainwater drainage and overflow <br /> Roof covering class <br /> ; �- Skylight glazing <br /> I Roof slope <br /> e <br /> �1� G. STRUCTURAL PLANS <br /> ' � f1 Material specification and strengths ; <br /> � � Floorloads �,� <br /> ���� Foof loads " <br /> - Wind load <br /> Seismic Zone 3 ��� <br /> Other loads (partition, etc.) 4��, <br /> B(cel�ng �w .,`:: <br /> _ Lateral bracing >�;:�. <br /> Engineers stamp ';::;'.�f�' <br /> x^.� <br /> Calculations � <br /> _ Special inspection r`�f:' <br /> � <br /> �a <br /> � . m�planck Rev:Febmary 11. 1993 � �f ' <br /> ' �5"?5`RJ�; <br />