My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10330 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
10330
>
BASE FILE
>
10330 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2017 8:44:10 AM
Creation date
2/10/2017 8:43:14 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10330
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� H. STRUCTURAL STEEL: <br /> 1. All steel, except pipe: ASTPR A-36. <br /> , All bolts ASTM A-307/A�• <br /> 2. All fabrication, erection and detailing in accordance witiz the <br /> latest edition of the "Manual of Steel Co:struction" of the <br /> American Institute of Steel Construction. <br /> 3. All welding by certified welderc in accordance with the "Welding <br /> Handbook" by the American Welding Society. <br /> 4 . All welds 3/16" min. continuous fillet welds using AWS A5, E70XX <br /> electroded. <br /> Weld beam hanger assemblies with continuous 1/4-inch fillet <br /> welds on one side of each component . <br /> 5, Provide washers and lock washers on bolted oonnections . <br /> 6. All steel not embedded in concrete or mas�woycoatseofiheavye shop <br /> coat of an approved primer paint. Apply <br /> asphaltic paint to all steel exposed to earth. <br /> 7 . Furnish complete shopdrawings prior to fabrication. <br /> 8. Metal roof deck fabricatior to submit shopdrawings showing layouts, <br /> welding patterns at supports, perimeter and side laps, thus <br /> providing a diaphragm capable oF resisting lateral shear forces <br /> as shown. Provide steel headers at all openings through the deck <br /> to satisfactorily distribute the load to supporting members . <br /> I. MISCELLANEOUS: <br /> 1. Contractor to verify all dimensions in the field. <br /> 2. Verify size and location of all openings in floor, roof and walls <br /> ' with mechanical and elect'rical work. <br /> 3, Provide temporary bracing as required until all permanent , <br /> connections and stiffings have been installed. <br /> 4 . Pre-fabricated items to be hand.led and installed per mfr' s <br /> recommendat:tons . <br /> -5•- <br />
The URL can be used to link to this page
Your browser does not support the video tag.