Laserfiche WebLink
...�+ . , . � _, f^� . <br /> '� gIYU1I. DECLARATION OF NON-SIGNIFICANCE <br /> �4-142 <br /> Description of ProPosal <br /> The proposed action is the iasuance of building and grading permits to <br /> allow the construction of a 6,500 square feet building containing a 4,700 <br /> square feet body shop and 1,800 square feet of office apace. The following <br /> factore were coneidered and the listed requirements were theirdreviewsofnan <br /> � to comments aubmitted by various city departments during <br /> Environmental Checklist for this praposal: <br /> 1� tY�is uee.iBThenaite is adjacentCto�an Ra5 residential zone tolthe <br /> north and bordera the city limits to the south and west. The site <br /> is currently mostly cleared and a few alders exist on the western <br /> poztion. Substantial fi11L8dedriaA largeepondlarea exists ontthe <br /> ' which has been partially g <br /> SCandardps[reet impr vements dornot currentlylexisthon89th orine. <br /> Evergreen Way frontage. <br /> Z, Accese is proposgivia 9th �nd Evergreen Way. Standard street <br /> improvements approved by Public Works Department including concrete <br /> A-1 curbe, gutters, 5-foot concrete sidewalks and standard aspha.it <br /> i street sectiona are required along the frontage of the development <br /> - , on Evergreen Way plus transitions as necessary. Maximum driveway <br /> estrlcthvehiclesifromdbackingfour. onto the public streeteL A <br /> minimum of 27 parking spaces are required for the entire site. <br /> �Parking areas for the new structure shall be hard surfaced with <br /> asphaltic or P. C. concrete pavement. <br /> I3; Drainage shall be designed in conformance with the city's drainage • ' <br /> + ordinance. All stormwater shall be conveyed to the n4si[e detention <br /> at the southern border of the site after providing <br /> � i� and oil separation. A temporary erosion control plan is required. <br /> I The tributary of Swamp Creek which runs across this site shall be <br /> I <br /> conaidered in drainage facility design. Any wark �'�und the stream <br /> is sub�ect to hydraulics review and approval by the Department of <br /> Fieheries. � <br /> � �/q, participation in the program to fund the south end sani=o'ry��ely <br /> ' interceptor is required. The nearest sewer main is app <br /> 1�500 feet to the north on 100th Street S.W. If a �public sewer <br /> syatem is not installed as a result of this project, a Power of <br /> 'Attorney for any future sewer L.I.D. in this area is required. <br /> Sewer service by Mukilteo Water District is possible provided <br /> 8pplicant can obtain agreem=ovedibh thetSnohomish.CountypHealthnk <br /> disposal system must be app Y � <br /> Dietrict. Also a pumPing gYstem will be necessary if this site <br /> - ie ultimately served by city sewer. <br /> �.i . C r a �� �--�LE • . <br /> b $o <br /> ���f' 3 h'/� <br />