Laserfiche WebLink
PUBLIC W012K <br /> I <br /> Item Unit Quautity Unit Prr�e Amo.�nt � <br /> PAVING i <br /> AC Pavement Patching(includes +� <br /> removal of old pavcment) S• Y• q-QC� 12.00 ¢ 880 <br /> 4"crushed rock S. Y 4.00 <br /> 6"cnuhed rock S. Y. 6.00 <br /> 2" Class B S. Y. 4.00 <br /> 3" Class B S. Y 6.00 <br /> 4: Class B S. Y. 8.00 <br /> Bank Rim Gravel, 3" (screened) in <br /> place _ C.Y. 7.50 <br /> 5/8" c�vshed rock, in place C.Y. 15.00 <br /> o� <br /> Saw Cut AC pavement Ft. y'�CU 2.00 � � <br /> Other <br /> PAVING TOTAL 5_ �' �CUU <br /> CURB & GUTTER <br /> vv <br /> Curb and gutter L.F. 7 -�;� 9.00 v�, �� <br /> Other <br /> CURB AND GUTTER TOTAL $_ P �'��U� <br /> 5 <br /> /� <br />