My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10500 EVERGREEN WAY 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
10500
>
10500 EVERGREEN WAY 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 1:49:46 PM
Creation date
2/10/2017 9:02:26 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10500
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' . ' . PUBLICWORKSDEPARTMENT I <br /> � • UtiliHes Division,3200 Cedar Street � <br /> Everett WA 98201 � <br /> 425-257-8800 � <br /> � � <br /> Receipt # Date Paid <br /> Cost of Work Order Work Order# <br /> ✓ Cost of Service Order 10,385.00 Service Order# <br /> Contact Person Galen�Drico Const) � Telephone# 425 745-9117 <br /> Requested By Gordon Witcher Date of Request 10-7-02 <br /> Property Owner(name) Performanee Nissan <br /> Charge Cost to(name if different than owner) <br /> address 10500 Evergreen Way City Everett Zip <br /> Installation Location Same <br /> Installation type/description/size/etc. 6"fire service. Expose 20" main tnstall control valve and <br /> make hot tap Excavate for and install vault DCDA bypass drain and meter. Contractor to <br /> restore. <br /> � The following estimate is based upon the Utilities Division providing all labor,equipment, <br /> materials,restoration,and final hook-�ip. <br /> Please notif�the City of Everett Utilities Division 10 working days in advance of reauired installation <br /> date to allow for scheduling and parts procurement <br /> Whenever the estimated cost is not sufficient to cover the total ex��ense for labor,material,equipment rental and <br /> administrative costs, the deficit shall be charged to the property for which such installation was made and the <br /> owner thereof, and nrovided further, that any excess payment shall be retumed to the person applying for the <br /> installation. <br /> 'Deposit must be paid prior to ordering parts or scheduling work. <br /> WATER METERS 3"AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br /> cc: Bldg. Permit Center <br /> Material 6,582.00 Mark Sadler <br /> Labor and Benefits 2,786.00 Kirk Drooks <br /> Gordon Witcher <br /> Equipment Rental 838.00 Robert W,ddle <br /> Tax 179.00 Matt Welbom <br /> Paul McKee <br /> TOTAL '$10,385.00 Gerry Crum <br /> 'If contrector furnlshes/installs vault 56607.00 Alan Locke <br /> Pre �red b j`�/�' Date Estimate Prepared /D/V�dZ <br /> P Y' ` <br /> ,lcccptcd by: Representing <br /> F.STIMATE GOOD FOR 6 MONTHS <br /> s�.c„�i���,�m�-i.��:,nn»i.r,nt.�e,����o�.����.U�uoc —oP— �d <br />
The URL can be used to link to this page
Your browser does not support the video tag.