My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10630 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
10630
>
BASE FILE
>
10630 EVERGREEN WAY BASE FILE 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2017 9:27:08 AM
Creation date
2/10/2017 9:26:44 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10630
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
136
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report <br /> Proposed New Storm Water Vault <br /> Northwest Mitsubishi <br /> Novembcr 18, 2002 <br /> CG Pile No. 1397 <br /> Page 4 <br /> 631.5 feeQ. Aclow the fill was a weathered zone that was loose to medium dense wiih trace <br /> organics. The surface water was trickling into the tcst holes and the excavated material was wet <br /> and ran into the excavation. Iivaluation of the bottom of the holes was JitficulL [n Test Pit t at a <br /> depth of 8.5 feet, the material appcared to be a b�ray sand wiPi silt to silty sand that was medium <br /> dense to dense. "Cest Pit 2 could not bc advanced into medium dense or better soils. It was not <br /> possible to detcrminc thc amount of subsurfacc watcr sccpagc in the holcs. <br /> CONCLUSIONS ANll RECOMMENDATIONS <br /> General <br /> The sile is considercd suitaUle for the planned improvements. The nati��e soil at depth appcars to <br /> be mcdium dense to dense soil that should provide good support for the planned strucwre. We <br /> expect that, due to �vct conditions and the depth to medium dense or better soil, some <br /> overexcavation under the vault and replacement with rock matcrial such as 2- to 4-inch rock <br /> spalls will be needcd. 1��c recammend that budgets plan for at least 9-inches of rock undcr the <br /> slab areas and at �cast 18-inches of rock under the footing areas. The rock spalls coutd be cappcd <br /> with 2-inches of tiner crushed rock for a better working surface. 'Che rock luyer may also be <br /> needcd duc to tf�c depth to suitable Uearing soil. Our explorations indicated that the elevation of <br /> suitable mcdium dcnse or better soil may be slightly bclow the planncd Pooting location. <br /> Winter scason grading is planned. Most likely backfill will be completed with soils that are <br /> highly moisture sensitive and dif5cult to compact when wet of optimum moisture. The parking <br /> arca crcated by the planned improvcmcnts is expccted to be gravel covered. We ha��c becn <br /> informed that sctHcment of thc backfill would be acceptable and could bc repaircd with importing <br /> of morc gra�cl. <br /> The lateral pressures acting on the structure will depcnd on Ihe materials used. We present two <br /> scts of figures — one assuming relatively poor compaction using silty sand from the site and <br /> importcd into thc site. Another set of figures assumes compaction meets at leasl 90 percent of <br /> maximum dry density based on ASTM D 1557. W� cxpect that compaction to 90 percent a�ill be <br /> difficult to achic��c wiih the planned construction sciiedule and expected conditions. <br /> Cornerstone Geotechnicaf, Inc. 5�l <br /> /!4 / <br />
The URL can be used to link to this page
Your browser does not support the video tag.