My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10910 EVERGREEN WAY HERITAGE HOME CENTER 2016-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
10910
>
HERITAGE HOME CENTER
>
10910 EVERGREEN WAY HERITAGE HOME CENTER 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2017 10:11:36 AM
Creation date
2/10/2017 10:11:27 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10910
Tenant Name
HERITAGE HOME CENTER
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TlE-DOWN INSTRCICTIONS o( Ihe home. In Zone II and III, connecl bolh the vehical <br /> tie-down straps and the diagonal Irame straps to double <br /> � After biocking and leveling, the home must be made head anchors. Slraps should not be tighl a1 Ihis <br /> secure Irom overturning due to wind. The requiremeNs will point.Construct the lie-down system wilh adjuslable <br /> vary depending on which wind zone your home is loceled in tevices in order that the strap tension may be periodi� <br /> (see the wind zone map shown on page 4). cally adjusted to compensete lor heaving and setlling <br /> In Wind Zone I, tie-down is accomplished by Installing 6. With one man on each side of the home, stan at the <br /> irame ties only supplied by ihe owrer or ins�aller. These front and lighten straps on both sides al Ihe same time. <br /> straps are wrapped around the (rame i•beems and The home cou�d be pulled ofl ils piers it all straps are <br /> anchored lo the ground. tlghtened on one sida at a time. <br /> in Wind Zones II and III, vertical tie-down straps installed <br /> by Ihe factury along the sidew611s must also be connected SINGLE WIDE CHART <br /> io ground anchors in addiUon to !he frame ties. u�crwa vn n+o Ho�e i�T i <br /> MiN uit. �e ie� is• ie ie� ie ie ie �e <br /> The number ol irame and vertical lies required varies STy,p �otio r,uxiMuueHcrwesa�cir+c�r� <br /> depend�ng on the wind zone and Ihe strapping method METHOD cwuitt zavei zoNeu toeein <br /> SEI2CIBd. SINGLE 17tS1&S. 9' u' I� 6�8' 6 6 5'�/' S'�P 6'�6 <br /> DOUBLE i150LB5. 20 27 EB' NA NA NA NA NA NA <br /> Ground anchors should be certilied by a professional NA-NOTAPPLICABLE(U�e�lnpl���r�p�p�clnq�. <br /> engineer, architect or a nationally recoynized testing labora- <br /> iory as 10 iheir resistance, based on the maximum angie oi SINGLE WIDE I <br /> diagonal lie ancllor vertical tle Ioading and angle ol anchor p-p' ? -o <br /> inslallation, and type of soil In which the anchor is to be IUJ(. Wl[RI1EOu1[ SPACWC P(R CHARI ue� I <br /> installed. � <br /> Ground anchors should be embedded below ihe frost I <br /> iine and be at least 12"above tha weter teble. � wee� FR�wC ' <br /> •- - -- -- -- <br /> Ground anchors should be instelled lo iheir (ull depih, � wpN� i-BE�u o � I <br /> and siabilizer piales should be installed lo provide edded � i_BEa� `" <br /> ---- ----- ------ •--�-- —� � <br /> resistance to overturning and sllding forces. � <br /> Minimum anchor capacity required is as noled and indi- u+CHOR—1 S��w�tt <br /> � [t�W+et� ;u(�+pa�— � <br /> c2ied on P.E. certitied Ground AnchoriFrame Tie Strapping ��;,,vJ IOP H[w Of HOut � <br /> Requ�rements detaiL j��� ' <br /> The fouowing instruclions are for irstalling tie-downs on <br /> a MarleY,e by Schult home. DOUBLE WIDE CHART <br /> � From Ihe chan and details below, select eilher the single u+cnoa `NiDTMOfMOME1�T1 <br /> Mu+ utt x' ir �7 ze ze• �r tc ze I �r <br /> or double strap method (Note: Double sirap method is STau, �OAD MUIIMUMMICHORSPACING(Ff) <br /> not available in zones II and Ilp. Be sure to use ground METH00 CAPACfiY :ONEI za+eu za+ew <br /> anchors equal to or stronger than the minimum load siHc� uzs�es. �r ir �r c e••e' e• �' s••r s• �� <br /> capacities tisted in the charl lor lhe methoc selected, oous� �w�es. u u' �z �u w� �+ � � � <br /> 2. Install ground anchors at lhe requlred localions per the ��A-NOTAPPLICA9LE(W�dnpl��lnp�pain9). <br /> delails shown below. Anchors should be installed per Ihe <br /> manulacturer's insiructions. 7�_Q• DOUBLE WIDE 7 .9• <br /> in Zone I, install single head ground anchors at all µ�X IM[fil1ED'A1L SPACNC PIR GUR1 uAY <br /> Irame•ue•only" locations when using Iha single slrap � <br /> melhod. Insfall do�ble heed ground anchors at all'Yrame- <br /> iie�only"Iccations when using ihe double strap method. "'"-- ""-'"�-- "�--"-� '�� ��� � � <br /> i � <br /> in Zones II and III, Install double head ground I ' <br /> ancnors al all ver.ical lie locations. ....___...._._..___..... .•- <br /> -- -- ----------.. <br /> ; The iiisi and last Irame ties must be installed wilhin 2'•0" � u�u�iC U�+( � i� <br /> ol �he ends ol ihe home. - (WRAP � rR,w( �v <br /> � - -•--" -"' _ <br /> 4 Endwan tie•downs are required at each I-beam. Run / �qa� �-B[� � <br /> anchor straps irom a double head anchor throuqh angled 1 i•B�� f I�' <br /> sloi cul in I-beam web, then, reWm to double head <br /> �••---- -------• -•------ `--•--- -..... � <br /> anchor. auCHOR�� S�^�� E4DWul �xCHUHS J <br /> 5 Connect frame ties to lhe irame I•beam at all ground tOP��[w Or �pu[ <br /> anchor locations (double and single head) on bolh sides <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.