Laserfiche WebLink
Application For <br />PUBLIC WORKS PERMIT <br />PUBLIC WORKS DEPARTMENT <br />3200 Cedar Street <br />Everett, WA 98201 (425) 257-8810 <br />TYPE OR PRINT ONLY <br />Date I—.Kq_ <br />Public Works Permit 11 Z <br />Building Permit N <br />Public Works Fee $ S3 F - <br />HIctlAel R, MA,i1140 510 RAINIER Age J SEhITLE k1A 28144 (1-06)123- 539' <br />Owner Malting Address City I Zip IPhone <br />KvSSMA/J AgScC./A.TFs Pro fox 17D5 (3ort+FLL tA.�A98041-1705 (425�48(o-%300 <br />Applicant Mailing Addrass Ciry Zip Phone <br />Describe Proposed Work. I a I TI At C Le^rWAJ F RAC I TE S �, AN W <br />M iri CrA•T-t oN Eb rL ifA—M.— eT AP/�2.TM£AITS <br />U) <br />PROJECT ADDRESS (if known) NU)Y 9 A )o II2T1t- STiLzEr S.W M <br />Attach four (4) copies plans for propcsed work - Draw to scale and note the following if applicable: O <br />• Property Lines • Outline and dimensions of all existing and proposed structures on the lot • Existing and proposed utilities <br />• Centerline of street • Indicate North • Show any proposed grading changes • Show measurements <br />DO NOT WRITE BELOW THIS LINE <br />PERMIT CONDITIONS: O <br />1. All calls for inspection shall be made 24 hours in advance - phone (425) 257-8810 <br />2. All work shall be performed in accordance with this permit and current City of Everett Design and <br />Construction Standards and Specifications. <br />3. Call Location Underground Service 48 hrs. before you dig. TOLL FREE NUMBER 1-800-424-5555. ♦A <br />J <br />on io <br />FINAL INSPECTION Date' <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and save harmless <br />the City of Everett from any and all claims for damages, costs, expenses, or <br />causes of action that may arise because of installation and maintenance of the <br />improvement or other right-of-way use hereto applied for and further agrees to <br />ra ppve Vng uporyaotke frgm the City and to replace public property dam - <br />WORK AUTHOREED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS'bF DATE issu D"ThEREAFfER IS TO BE mice ILY RIRSUED TO <br />COMPLETION. THIS PERIAIT MAY BE CANCELLED BY THE CRY UPON ANY STOPPAGE ON THS PROJECT OVER go DAYS DURATION. <br />