Laserfiche WebLink
The following note ahould be added on the page with the <br /> biofiltratior. swale cross-sectional details: <br /> NOTE: the specified biofiltration seed mix is not a <br /> standard mix and will need to be specially ordered. All�w <br /> 3-4 weeks for delivery of the mix. If problems are <br /> encountered in obtaining a mix meetinq the City�s <br /> specifications, please contact Jane Zimmerman, City of <br /> Everett Public Works, at 259-8800. <br /> Standards for vegetated swale construction have changed <br /> recently and are not yet included in the standards manual. , <br /> . The paragraphs qiven in the attached sheet entitled <br /> "Construction of Vegetated Swales" muet be included on the <br /> plans. <br /> The swale seed and plant list from paqe IV-17 of the City's <br /> standards must also be included on the plans. A copy of tlie <br /> list is attached. The list of additional vegetation for <br /> biofiltration swales was written for a one foot wide swale. <br /> Given that the swales on this site are designed to be wider <br /> than one foot, the specification for each vegetation type <br /> must be changed from "25 clumps per lineal foot of ewale" to <br /> "25 clumps per s�cuare foot of swale". <br /> The actual contours for the swale and how they relate to the <br /> surrounding topography must be shown. <br /> Where a swale is located adjacent to a building, a minimum <br /> of ten feet of essentially flat ground should be provided <br /> between the building and the top of the swale. <br /> The swale construction notes and swale planting/seeding <br /> requirements must be shown on both the landscaping plan and <br /> the storm drainage plan, as well as the attached detail <br /> showinq the cross-section of the biofiltration/grass swale. <br /> The entire associated side slope of the swale, from the <br /> bottom of the swale to the top of the adjacent bank, must <br /> have a maximum slope of 3: 1 unless rockeries or retaining <br /> walls are used. Rockeries or retaining walls meeting the <br /> distances in the attached detail may be used to provide the <br /> vertical drop necessary for the slope of the swale to have a <br /> maximum slope of 3 : 1. <br /> The entire associated side slope of the swale, from the <br /> bottom of the swale to the top of the adjacent bank, must <br /> have a maximum slope of 3 :1 unless rockeries or retaining i <br /> walls are used. Rockeries or retaining walls may be used to <br /> provide the vertical drop necessary to meet the swale side <br /> slope requirements, but the minimum distances shown in the <br /> attached d�atail must be met. In addition, a minimum of 4 <br /> horizontal feet is required for rockeries under 7 vertical <br /> feet that are constructed per City standards. <br />