Laserfiche WebLink
`t _ <br /> �!�.. <br /> � � <br /> � ' <br /> :.�." APPend�a F . . <br /> ;„ Qricic Rderence S6eet For Revkwin�3prfnkler Plans <br /> - '�7 Q� <br /> f, . <br /> �It iafaem�tim�t to ieview plaas? <br /> (pipe sizet.di�nces becvvem bwach lines�ad sp�iorieca.aoaa�ction if neces�ary.eoc.) <br /> (Sa paje ll.) <br /> � Is the haard ad/a commodiry clasrifiafio�i peoper for dro accapan�y?(See page 6.) <br /> ��,,�.� c,rc� F-r�e.*��� [-co-�' / a�o "a <br /> (3) 1s the P�°�Pa�widria ieqoi�emean far ehe app�optiax herard <br /> classifiwdan7(See page 21.) � � � �Q tp <br /> l <br /> � � Ane distances betaveen the branch lines aad between aptinrlers on die branch lines aithin the <br /> ms�dmom allowable?Are ead speinklers an¢end biaach lines within the allowable diatanas <br /> from t6e walls?(Sce page 19.) 1 � � 1 S <br /> �(S� Aie sprinkleis Pusidonad within allowable deflecta distances•to•ceilings? <br /> Are t6e cleazances w obstruction proper?(See pagu 22 ond 23.) <br /> �(6S Are sprinklers the proper oemperuure tating for ma�cimnm expecxd ce�ing oemperanues and <br /> proximiry to unit heateis,skylights,etc.?(See page 17.) ll s � <br /> ?-t 2 <br /> � ) Has a system ust pipe (inspector's test connection)been provided ac the end of each spiinkier <br /> sysxm7(Set pagt 44.) <br /> 7 <br /> � ��"'� (8} Has a fue depamnr� �nnecrion (siamese pumper connecrion) been provided and properly <br /> loeated?(Sec pagt. <br /> � � A:s sufficient pipe hangers properly located? (See page 33.) <br /> � .e►:e a sufficient number of rystems provided to meec the maximum system size iequiremenu? <br /> � (See page 36.) J;�� G�� � G�L <br /> � <br /> � �a dry sysxm.does the o�tal system volume requue a quick opening device?Does the rotal <br /> system volume fall within speci5ed limia or will a 60-second water delivery dme need m be <br /> proven?(See pagc 36.) o �l �J I�S C..,/��^,��( <br /> M12) Is a sysoem drain of adequa[e s'v.e provided?(See page 37.) <br /> � 3) Das the wster supply data appetr:easoaably raxnt?Do the plaas indicaoe when and where <br /> the L�st flow test was made�nd who pafoimed it?(See page 45.) <br /> � If a y�y aesignea symm.ao t�design aeasiry ana uea meet the proper carve? <br /> (See Fage 29.) • <br /> NFSA Fie Sp�intia PLn Reriaw�Quide il <br />