Laserfiche WebLink
:y <br /> �- � .. � .., . <br /> :. .: APPendiz F . . <br /> f,. Qatck Reference S6eet For Re�iewfn� 3prloida�Plans <br /> '.;�• � <br /> � . <br /> -- 7'�7 Q� <br /> �is mfaemation a�icieat to ieview pLas7 <br /> (�ipe siza,dbnaas betweea hnnch line:aod spzioklees.cross�if�sary�ex.) <br /> (Set pagt 11.) <br /> � Is t6e h�r�rd�od/a oommodiry clstti5u�an proper for d�e oavpancy?(See page 6.) <br /> ,,k,,,..� ter�w 1—naer��G LlG-r.�T � Ckl� N oZ <br /> (3) ��e P'c�ction ma PQ sprinkler within�sqnie+emwia for the�ppropriate husN <br /> ciassifipdan?(See page 21.) ,�, � t g Q t� <br /> I <br /> � � Ate disnnas betvveen the btat►ch lines and betweea sprinklas on the btanch lines within d�e <br /> maximom ariowable?Are ead sprinklers an¢end bruich lines within the allowable distancxs <br /> - from d�e weW?(Sec poge 19.) .� � �}. 1 S <br /> � Aie sprinlclets Positioned withia allowable defleaa distanas•to�ceilings? <br /> Are the cleffiances to obsaucaon proper?(See paga 22 and Z3.) <br /> �6S A:e sprinklers the proper xmperamre ratiag for maximum expecxd ce�7ing tempeiaaames aad <br /> proximiry to unit heauis,skylights,eu.?(See page 17.) !C+ � <br /> �2 <br /> ) Has a system ust pipe (inspector's xst connection) been provided at the end of each sprinkler <br /> sysoem7(Stt page 44.) <br /> 7 <br /> ��"� (8) Has a fsse depaztment connection(siamese pnmper coonection)been provided and properly <br /> locatai?(See page 38.) <br /> 9) An:sufficient pipe hangers properly lacated?(See page 33.) <br /> i <br /> � ; Aiz a sufficient number of sysums provided m mat the maAmum system size requi:emeuts? <br /> (See page 36.) J��� G�� � G��, <br /> �a dry sysxm,does the total sysoem volume iequire a quicic opening devia?Does du total <br /> � / svstem vnlume fall within specified limiu or will a 60-sxond waur delivery rime nad to be <br /> provea?(See pagt 36.) � z l �1 I�5 C,L�2�`�� <br /> � 12) Is a sysoem drain of adequax aize provided?(See page 37.) <br /> ��Das the wata supply data appesr ieasonably nant?Do che plaus indicax whea and where <br /> the last flow test wat made and who perfoimed it?(Ste page 45.) <br /> d) If a hyd�ulically designai symm,do d�e design deosiry and uea meet t6e proper curn? <br /> (See page 29.) • <br /> rffsn�s��x�co� at <br />