Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET <br />PROJECT TITLE: <br />Call for Bids for the <br />Construction of the Water <br />Main Replacement H Project <br />Location <br />Smith Island (See <br />Attached Map) <br />Amount Budgeted <br />Expenditure Required <br />Budget Remaining <br />Additional Required <br />X Consent <br />Action <br />First Reading <br />Second Reading <br />Third Reading <br />Public Hearing <br />Preceding Action <br />None <br />$600,000.00 <br />$2,000.00 <br />$598,000.00 <br />$0 <br />DETAILED SUMMARY STATEMENT: <br />COUNCIL BILL # <br />Originating Department <br />Contact Person <br />Phone Number <br />FOR AGENDA OF <br />PW/Utilities <br />Jenifer Galatas <br />257-7215 <br />June 15, 2005 <br />Initialed by: <br />Department H d vim^ <br />CAA <br />Council Presiden <br />Attachments Department(s) Approval <br />Project Location Map <br />Account Number(s): UP 3220 <br />The Water Main Replacement H project will replace approximately 5,200 linear feet of deteriorated asbestos <br />cement and cast iron water mains with approximately 2,600 linear feet of new HDPE water main. The <br />replacement of these mains will provide increased reliability of the system. <br />The existing asbestos cement and cast iron mains have deteriorated, this is confirmed by the increased <br />number of leaks and breaks that have occurred in the past few years. <br />This project was designed by City of Everett staff. The design is now complete and the project is ready to <br />bid for construction. <br />RECOMMENDATION (Exact action requested of Council): <br />Authorize a Call for Bids for the construction of the Water Main Replacement H Project. <br />2 <br />