Laserfiche WebLink
�' , i <br /> Mollie Flughes � (xi I�-el� <br /> From: Michael Brck <br /> Sent: Monday, December 14, 2009 4:11 PM <br /> To: Mollie Hughes <br /> Cc: Gordon Witcher; Dave Tyler j <br /> Subject: RE: AutoZone SEPA09-013 � <br /> Mollie, -- — - <br /> For the current phase (construction of a 7,831 SF AutoZone buildin�q)2he t�affc m gation fee due is $6,183. This enti�ly <br /> uses the existing site use credits for this location. This fee is�'how. --��= <br /> For the second phase(construct�on of a 10,624 SF Retail buil ?ig)-1he-trafficmit� ion ee o 15,543 will be due. No <br /> existing site use credit may be ta,cen for this phase as it has all be"used up"on phase one. This component will not be <br /> due until the second phase is underway. <br /> Michsel <br /> From: Mollie Hughes <br /> Sent: Monday, December 14, 2009 1:48 PM <br /> To: Michael Brick <br /> Subject: RE: AutoZone SEPA09-013 <br /> The building size for AutoZone is 7,381. The 2"d building will be 10,6Z4 sf. <br /> Mollie Hughes <br /> Permit Tech, City of Everett <br /> 420-257-8810 <br /> To obtain applications and check lists, visit our website at: http//www everettwa.orq <br /> From: Michael Brick <br /> Sent: Monday, December 14, 2009 1:28 PM <br /> To: Mollie Hughes <br /> Subject: RE: AutoZone SEPA09-013 <br /> Mollie, <br /> If we are only going to be issuing building permits for one of the buildings then we should on!y collect the traffic fee for the <br /> building being completed. If you xovide me with the building square footage for the building under review I will <br /> recalculale the traffic mitigation fe. for the current portion of the project and let you know what the updated number is. <br /> Thanks, <br /> Michael <br /> From: Mollie Hughes <br /> Sent: Monday, December 14, 2009 12:24 PM <br /> To: Michael Brick <br /> Subjed: AutoZone S�PA09-013 <br /> 11308 Evergreen Way <br /> 1/v� <br />