My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/06/20 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/06/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2017 11:39:42 AM
Creation date
2/10/2017 11:38:56 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> CITY OF EVERETT WASHINGTON <br /> HAZARD MITIGATION PLAN <br /> This scope of work builds upon the product produced as.a result of a March 16'h 2004 contract.As a result of <br /> the March 1661 effort,a planning document was prepared.The following scope of work provides for such input <br /> and adds to this earlier product with the inclusion of a seismic evaluation of critical structures. <br /> I. Review of existing documents for DMA compliance. <br /> 2. Conduct ATC 21 assessment for <br /> a. Structures housing critical facilities <br /> b. Key commercial structures <br /> c. CBD to extent possible <br /> d. Incorporation into GIS layer for possible inclusion into HAZUS MH-1 <br /> 3. Hold stakeholder meeting to develop/refine action items and plan maintenance <br /> a. Prepare materials for meeting <br /> i. Agenda <br /> ii. Worksheets <br /> iii. PowerPoint presentations <br /> b. Conduct Meeting <br /> c. Develop/refine action items following meeting for inclusion in plan <br /> i. Verify <br /> ii. Develop <br /> iii. Prepare general B/C estimates. <br /> iv. Incorporate action items and supporting information into Plain <br /> 4. Hold 4 Neighborhood meetings <br /> a. Locations <br /> i. Mukilteo Boulevard Bluff <br /> ii. Southwest Downtown <br /> iii. Port <br /> iv. South East Everett Ridge <br /> b. Prepare materials for meetings <br /> i. Agenda <br /> ii. Worksheets <br /> iii. PowerPoint presentations <br /> c. Revise action items for inclusion in Plan <br /> 5. Revised plan document. <br /> 9 1. 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.