Laserfiche WebLink
17 <br /> EXHIBIT A <br /> SCOPE OF WORK <br /> CITY OF EVERETT WASHINGTON <br /> HAZARD MITIGATION PLAN <br /> This scope of work builds upon the product produced as.a result of a March 16'h 2004 contract.As a result of <br /> the March 1661 effort,a planning document was prepared.The following scope of work provides for such input <br /> and adds to this earlier product with the inclusion of a seismic evaluation of critical structures. <br /> I. Review of existing documents for DMA compliance. <br /> 2. Conduct ATC 21 assessment for <br /> a. Structures housing critical facilities <br /> b. Key commercial structures <br /> c. CBD to extent possible <br /> d. Incorporation into GIS layer for possible inclusion into HAZUS MH-1 <br /> 3. Hold stakeholder meeting to develop/refine action items and plan maintenance <br /> a. Prepare materials for meeting <br /> i. Agenda <br /> ii. Worksheets <br /> iii. PowerPoint presentations <br /> b. Conduct Meeting <br /> c. Develop/refine action items following meeting for inclusion in plan <br /> i. Verify <br /> ii. Develop <br /> iii. Prepare general B/C estimates. <br /> iv. Incorporate action items and supporting information into Plain <br /> 4. Hold 4 Neighborhood meetings <br /> a. Locations <br /> i. Mukilteo Boulevard Bluff <br /> ii. Southwest Downtown <br /> iii. Port <br /> iv. South East Everett Ridge <br /> b. Prepare materials for meetings <br /> i. Agenda <br /> ii. Worksheets <br /> iii. PowerPoint presentations <br /> c. Revise action items for inclusion in Plan <br /> 5. Revised plan document. <br /> 9 1. 10 <br />