My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005/06/20 Council Agenda Packet
>
Council Agenda Packets
>
2005
>
2005/06/20 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2017 11:39:42 AM
Creation date
2/10/2017 11:38:56 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/20/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> EXHIBIT B <br /> SCHEDULE OF PAYMENTS <br /> Pettelle shall be paid as follows, provided that the maximum payment shall not exceed$45,000. Pettelle <br /> shall be responsible for payment of all applicable local, state and federal taxes.Pettelle shall provide all <br /> labor and materials necessary to produce and complete the Statue and be responsible for delivery, <br /> installation and documentation of Statue. <br /> • $10,000(Ten Thousand U.S. Dollars)upon receipt of invoice for conceptualization, research and <br /> preliminary work, including design and clay maquette development. <br /> • $26,000(Twenty six Thousand U.S.Dollars)upon receipt of documentary photographs showing <br /> Statue at 60%completion stage.Cultural Commission staff will determine if Statue is 60%complete <br /> by comparing documentary photographs with slides of similar completed work submitted by Pettelle in <br /> the call-for-Pettelles application. <br /> • $9,000(Nine Thousand U.S. Dollars)upon completion of fabrication and installation, receipt of <br /> support materials, and final acceptance of Statue. <br /> i0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.