Laserfiche WebLink
1 1 T******) <br /> 2 Permitted times for lane and roadway closures are listed below: <br /> 3 <br /> 4 SR 529 lane closures shall be permitted as follows: <br /> 5 <br /> 6 Southbound SR 529 <br /> 7 Monday 9:00 am to Tuesday 6:00 am the following day <br /> 8 Tuesday 9:00 am to Wednesday 6:00 am the following day <br /> 9 Wednesday 9:00 am to Thursday 6:00 am the following day <br /> 10 Thursday 9:00 am to Friday 6:00 am the following day <br /> 11 <br /> 12 Northbound SR 529 <br /> 13 Sunday 6:00 pm to Monday 2:00 pm the following day <br /> 14 Monday 6:00 pm to Tuesday 2:00 pm the following day <br /> 15 Tuesday 6:00 pm to Wednesday 2:00 pm the following day <br /> 16 Wednesday 6:00 pm to Thursday 2:00 pm the following day <br /> 17 Thursday 6:00 pm to Friday 2:00 pm the following day <br /> 18 <br /> 19 SR 529 directional roadway closures shall be permitted as follows: <br /> 20 <br /> 21 The Contractor shall be allowed to close southbound SR 529 a total number of two (2) times and <br /> 22 northbound SR 529 a total number of two (2)times. <br /> 23 <br /> 24 Southbound closures shall be allowed starting 11:00 pm, Saturday to 7:00 am Sunday. <br /> 25 Northbound closures shall be allowed starting 11:00 pm, Friday to 5:00 am following <br /> 26 Monday. <br /> 27 <br /> 28 The southbound and northbound SR 529 roadway closures shall not occur <br /> 29 simultaneously and SR 529 lane closures shall not be allowed in the direction opposite to <br /> 30 SR 529 roadway closure. <br /> 31 <br /> 32 Testing of Bridges 529/10 E&W shall be allowed starting 11:00 pm, Saturday to Sunday at <br /> 33 7:00 am during the above directional roadway closures. <br /> 34 <br /> 35 <br /> 36 If the Engineer determines that such lane restrictions are causing traffic congestion, the <br /> 37 Contractor shall open all lanes to traffic until the congestion is eliminated. <br /> 38 <br /> 39 For movable span structures, the Contractor's operations shall be arranged to permit the opening <br /> tO of the moveable span whenever required by marine traffic. <br /> 11 <br /> t2 Bridge sidewalks shall be kept clear and open to maintain safe pedestrian traffic. <br /> 71 <br />