Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA ITEM COVER SHEET 15 <br /> PROJECT TITLE: <br /> Change Order#5 with Consent COUNCIL BILL# <br /> Wilder Construction for the X Action Originating Department Public Works <br /> 41st Street Overcrossing- First Reading Contact Person Tom Fuchs <br /> Structure project. Total Second Reading Phone Number 425-257-8931 <br /> Amount of Change Order#5: Third Reading FOR AGENDA OF June 20,2005 <br /> $ 250,000.00 Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> 41st Street East of Bid: 8/6/04 Change Order#5 Public Works <br /> Interstate 5 Award: 8/18/04 <br /> Amount Budgeted $ 8,250,000.00 <br /> Expenditure Required $ 8,201,035.50 Account Number(s): PW2595,2697, 3225 <br /> Budget Remaining $ 48,964.50 <br /> Additional Required $ -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Change Order#5 was written in the amount of$250,000.00 to create a new work order 3225, funded from <br /> City Water Utility funds to construct a new 16"water main across the 41st Street Overcrossing structure. <br /> Riverfront utility conceptual design options have identified this routine as the most feasible method to serve <br /> the domestic and fire flow needs of the area. The work will be done on a force account. <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order#5 for the 40 Street Overcrossing- Structure project with Wilder <br /> Construction in the amount of$ 250,000.00. <br />