Project:41S`Street Overcrossing Project <br /> Change Order No. 5 <br /> Change Order Effective Date: 6/8/05 <br /> Exhibit A—Description of Changed Work <br /> Create new work order 3225,funded from City of Everett Water Utility funds in the amount of <br /> $250,000.00 and used to construct a new 16-inch water main across the 41g street Overcrossing structure. <br /> Work is to be done on a force account basis per section 1-09.6 of the 2004 Standard Specifications. <br /> Work Description: Supply labor,equipment and materials to construct a new 16-inch water main for <br /> schedule B portion of the work as shown on additional contract drawing sheets WL1 thru WL10 and <br /> specifications section 5,pages 1 thru 15 of 15,(and applicable standardized drawing attachments),as <br /> prepared by HDR Engineering,Inc. <br /> Exhibit B-Justification <br /> Original contract plans on the 4151 Street Overcrossing Project did not include the installation of a water <br /> main for future use to the Simpson Site. Waterline is being added in anticipation of redevelopment of the <br /> Riverfront properties. <br /> The Utilities Department explored various options to bring water to the Riverfront properties development <br /> area.The best source of the water was to tie-into an existing water main at the intersection of 41S`street and <br /> Smith Avenue. From that point one option was to bore underneath BNSF tracks and install water main <br /> using conventional trenching techniques.The second option was to design the waterline to cross over <br /> BNSF tracks using the new 41g Street bridge structure. Having evaluated both options Water Department <br /> concluded that the second option is the quickest and cheapest approach. This change order is being written <br /> to add a new 16-inch water line to be installed on the underneath side of the bridge deck of the new 41S` <br /> Street bridge structure. <br /> 93 <br /> Exhibit A <br /> Page 3 of 3 <br />