Laserfiche WebLink
Message Page 1 of 1 <br /> Jeff Chambera <br /> From: Jelf Chambers <br /> Seot: Thursday, December 08,2005 9:30 AM ��wO(p.('iZ—U?�j <br /> To: 'Faheem Siddiq' <br /> Cc: Anna Nguyen;'ScottRDG@aol.com' <br /> SubJset: Everett Wal-Mart Outlot for Panda I <br /> Faheem, <br /> Can we skip the pre-development meetlng for the Wal-Mart outloh We are alroady entitbd through Ihe SEPA <br /> MDNS dated 6-25-04 which allows 180,000 SF of retail. The Wal-MaR is 148,764 SF evhich leaves 13,235 5F. <br /> The Panda Express on Lot B will be 2442 SF. The SEPA MDNS sfates 180,000 for iour bts but k also says 8 <br /> includes the RV iot(Lot D). Dces fhe 180,0(!0 include the buiiding on that Iot7 We had stated 160,000 for new <br /> retail so Just need to make sure the other outbt owner knows what he can build. We are aiao going to InGude the <br /> 70 foot Type III bu(fer along Evergreen way whkli can be used to account for the 35 SF ai landscaping per stall <br /> required by the MDNS. A twayear maintenance bond will be submitted after aite plan approval. Parking per <br /> Code is stated as 1 per 100 SF for restaurant use which means we need 25 atalls,2%of which must be <br /> handicapped Fer the SEPA MDNS with a minimum of rivo stalls for the PaiMa. We will provide at least one <br /> pedestrian axess point with ADA slopes to Evergreen Way. <br /> I think will cover the items you will be concerned about. If there is anything else, let me know. <br /> JeJjChambers,P.E. <br /> PACLAND <br /> I IM Fy�ake Avc Eu4 Suite 601 <br /> SnWe,WA 98109 <br /> OlFice:(206)522-9510 <br /> Fex:C-�)532-8310 <br /> �2��2�Z0�5 <br />