Laserfiche WebLink
���� <br /> Cliff L��dman <br /> Fr Kirk Brooks <br /> Sent: Thursday, August 17, 2006 3:58 PM <br /> To: 'fredQpancocon.com' ��G � _G3 <br /> Cc: Cliff Lindman p 7 <br /> Subject: Outlot 2,Wal-mart Site <br /> Fred, <br /> As we discussed earlier, the water main on the south side of the building you are constructing is only about 1ft from the <br /> edge of the footing. This location is not acceptable to our water department. this obviously presents a certain amount of <br /> difficulty if the Water department ever needs to dig up the main and work on it. It apFears that when the main was recenUy <br /> replaced that it was moved to the north and closer to the building than was originally planned. Options for elimina6ng this <br /> problem could be expense and time consuming. One option would be to move the water main, another would be to move <br /> the building. A third optio�would be to increase the depth of the footing along the side of the building where the water main <br /> is located. This would provide greater stability to the building if it ever became necessary for the excavate the main. The <br /> City considers the third optior� an acceptable solution to this p�oblem. If you have any questions please contact me at 425- <br /> 257-8815. <br /> Kirk <br /> i <br />