My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11802 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
11802
>
BASE FILE
>
11802 EVERGREEN WAY BASE FILE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 11:33:08 AM
Creation date
2/10/2017 12:00:35 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
11802
Tenant Name
BASE FILE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�T � <br /> \ <br /> ENG/NEERING / PUBLIC SERV/CES DEPARTMENT <br /> May 4, 2006 <br /> Mr. Jamie Trenda <br /> Freiheit & Ho Architects <br /> 10940 NE 33'� Place <br /> Suite 202 <br /> Bellevue, WA 98004 <br /> R�: Owner: I3ari Mangement <br /> JoU Address: 11804 Evergreen Way <br /> Plan Check No: B0604-005 <br /> Dear Mr. Trenda: <br /> In response to your application for a construction permit, your plans have been examined and <br /> you are advised that the issuance of a permit is being withheld for the reasons listed below. <br /> These comments address building issues only. Additional revisions, or additions, may be <br /> required by otLer departments (such as Utilities, Planning or Fire). All references refer to the <br /> 2003 International Building Code, as amended by the State of Washington and/or Washi���;ton <br /> State Ener�y Code, 2004 Edition, unless stated otherwise. <br /> In order for the processing of your application to continue, it will be necessary to pro��ide <br /> tlie Building Division witl� hvo complete new sets of drawings reflecting tl�e corrections <br /> requcsted. <br /> 1. The submitted envclope summary for Washington State Energy Code compliance <br /> includes R-10 Slab Perimeter Insulation. This should be included in the plans. <br /> 2. Architectural cross sections of the roof construction include "Sheathing Per Stcuctural" <br /> and "Substrate Boa:d" in addition to the metal roof deck. Please clarify and provide a <br /> detail oC how it is to be constructed. <br /> STRUCTURAL <br /> 1. Please provide a copy of the Geotechnical Report. <br /> 2. Please provide analysis and detailing for th: built-up parapet tops. <br /> 3. Please provide the manufacturer's specifications for ttte metal roof decking incluciing <br /> listed shear values and detail of the "Delta-Grip TM System." <br /> 4. Please address the indicated (7) 9.Ok and (2) 4.Ok loads to be applied to the roof girder <br /> on grid B between grids 3 and 6. <br /> CIIY OF EVERETT• 3200 Cedar Street • Everett,WA 98201 • (425) 257-ly80li• Fax(425) 257-8856 ��� <br /> �GIlI:P1Y.CY.A1STRlNILLER�OW01-0OS(I I8b EV[RGRGEN WAl'� <br />
The URL can be used to link to this page
Your browser does not support the video tag.