Laserfiche WebLink
ProJecl Name Original Roadhouse Gril18 ReWil Development TraHic Revlewer MGB <br /> ProJect Location 11804 Evergreen Way Dev Reviewer GW <br /> ProJect Description ResWurant and Specialry Retail Development Planner <br /> Received Date �/3/2006 Due Date 3/9l2006 Review Date 3/8f2006 File# <br /> Area Type �CBD �SW Everett ❑X Remainder <br /> �TRAFFIC STUDY RE�UIRED <br /> Site Access <br /> �Check Si ht Distance(From Table 1,atlached) �At Interseclions �At Driveways <br /> Residential Develupment-Vertica'Clearance from 30"to 60"above pavement 10'from Back of Curb <br /> X Commcrcial Development-Verti;,al Clearance from 30"to 84"above pavement 15'from Back of Curb <br /> x Right In I Right Out Tum Restriction at Evergreen Way �Condition of Permit X Possible in Future <br /> Access point requires lraKc control device �Stop Sign �Yield Sign Signal �Median/Island <br /> All roadways and driveways must meet City of Everett Design Standards <br /> Access pa�it is public roadway, use City of Everett standard intersections <br /> Acces�point is privale roadway,use City of Everett standard driveway plans <br /> Check access point �Spacing-Adjacent �Spacing-Op�osite �Throat Depth �Grade <br /> All accass points must be paved <br /> Reduce potential conFlict points �Access Pcints �Street Intersections �Driveway Cut <br /> X Access point onto Airport Roadrequires realignment <br /> Access points requi�e consolidation <br /> Shared access with adjacent property required <br /> Provide pedestrian access to �City Sidewalks �All Building Doorways � <br /> Pedestrian facitities must be separated from vehicular traffic <br /> Putential emergency vehicle access issues-Review with Fire Marsha!I <br /> � Airport Road driveway should be ali ned with Center Road <br /> Site Circulation and Parking Issues <br /> Provide project location map, including adjacent driveways, local and arterial intersections <br /> Provide detailed site plan, including circulation and parking details <br /> Reduce potential intemal circulation con0icls <br /> X Provide at least 127Total Parking Spaces <br /> Provide at least_Visitor Parkinq Space <br /> Provide parking anatysis indicating total estimated parking demand for project <br /> X Parking layout must be consistent with City of Everett Standards <br /> All parking areas should be paved <br /> Pedeslrian route should be behveen parking rows and separeted from vehicle drive surface <br /> Provide commercial vehicte turn-around space I turning radius <br /> Provide freight vehicle turn-around space/tuming redius <br /> Is freight loading/unloading zone required <br /> Check dumpster locations with disposal company <br /> City of Evereft StaH Use Unly <br /> '�3 <br />