Laserfiche WebLink
� INSPECTION REPORT � <br /> j���� Address��SG= <br /> 7 <br /> Contractor • <br /> Owner 1:e� e 7" <br /> Date — � — <br /> APPROVAL U PARTIAL APPROVAL <br /> ❑ VIOLATION a CORRECTION REQUESTED <br /> O Cortections listed be�ow MUST BE UADE before work can be approved. <br /> U Please contect inspector and erra�ige for eppointment. <br /> O Was not eble to perform inspection. <br /> ❑CALL(425)257-8810 FOR REINSPECTION—24 hour notice required <br /> A CERTIFICATE OF OCCUPANCY SHALL BE ISSUED AND POSTED <br /> ON THE PREMISES PR10R TO OCCUP�NCY. <br /> ------ <br /> ---- <br /> i <br /> Inspeator <br /> Date � <br /> OF INSPECTION REQUESTE <br /> E��,y, ❑Framing �Gas Pipinp <br /> ❑Temp. ❑p�al(,Nailing ❑Consutt2tion <br /> 0 Footing , ❑Shear Nailing OO Groun Slab <br /> ❑Foundation D Grid <br /> p W od Stove ❑Rough-in inal <br /> 0 M ry ❑Sernce 0 Insulation <br /> O Other <br /> 8��:P� No :J MECH:Pmt.No. <br /> O ELEC:Pmt.No. 0 PLBG:Pmt.No. <br />