My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8920 EVERGREEN WAY THE RESERVE 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
8920
>
THE RESERVE
>
8920 EVERGREEN WAY THE RESERVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 3:55:48 PM
Creation date
2/10/2017 1:54:06 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8920
Tenant Name
THE RESERVE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pe 'C <br />i <br />PUBuc WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street Cb'm <br />ev err Everett WA 98201 <br />425-257-8800 <br />• <br />Receipt # Date Paid <br />Cost of Work Order Work Order# of 0/ !b I Z y <br />X Cost of Service Order 5,674.00 Service Order # <br />Contact Person Jared Underbrink Telephone - 00 <br />Requested By Gordon Witcher Date ofR st 9/23/13 <br />Property Owner (name) Vinta eCanddle IP, I. 1p, <br />Charge Cost to (name if different than owner) <br />Address 3424 Via Oporto #201 City Newport Beach, zip 92663 <br />CA <br />Installation Location ii-Evergreen Way 9uo <br />Installation type/description/size/etc. 4" tap and stub to back of sidewalk. Concrete <br />estimate included here Asphalt restoration included with 6" DCDA. <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />'Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS P AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />2,999.00 <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Labor and Benefits 1,627.00 Gordon Witcher <br />Matt Welborn <br />Equipment Rental 960.00 Mike Ward <br />Tax 98.00 Raridy Allen <br />Paul McKee <br />TOTAL 5,674).00 <br />Prepared by: Mike Ward �fil d / Date Estimate Prepared 10/9113 <br />Accepted b,: <br />Representing <br />ESTIMATE GOOD FOR 6 MONTHS <br />S.-WCommonuleriaBCost est1201218800 Evergreen Way (b)101113.doc <br />l 0(1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.