My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8920 EVERGREEN WAY THE RESERVE 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
8920
>
THE RESERVE
>
8920 EVERGREEN WAY THE RESERVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 3:55:48 PM
Creation date
2/10/2017 1:54:06 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8920
Tenant Name
THE RESERVE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 PUBLIC WORKS DEPARTMENT <br />Utilities Division, 3200 Cedar Street <br />ev Everett WA 98201 <br />425-257-8800 <br />s <br />Receipt # <br />Cost of Work Order <br />X Cost of Service Order 28,749.00 <br />Contact Person Jared Underbrink <br />Requested By Gordon Witcher <br />Property Owner (name) Vintage Canddle <br />Charge Cost to (name if different than owner) — <br />Address 3424 Via Oporto #201 City <br />Date Paid <br />Work Order# ;lvf Y 61,81, <br />Service Order # 5o '-1 3 oZ 3 7 <br />Telephone # 425-778-8500 <br />Date of Request 9123/13 <br />Newport Beach, Zip 92663 <br />CA <br />Installation Location 8800 Evergreen Way <br />Installation type/description/size/etc. Complete installation and restoration for 4" meter. <br />Asphalt restoration costs included in estimate for 6" DCDA. <br />® The following estimate is based upon the Utilities Division providing all labor, equipment, <br />materials, restoration, and final hook-up. <br />Please notify the City of Everett Utilities Division 10 working days in advance of required installation <br />date to allow for scheduling and parts procurement <br />Whenever the estimated cost is not sufficient to cover the total expense for labor, material, equipment rental and <br />administrative costs, the deficit shall be charged to the property for which such installation was made and the <br />owner thereof, and provided further, that any excess payment shall be returned to the person applying for the <br />installation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS 3" AND LARGER MAY HAVE A SIX TO 10 WEEK LEAD TIME. <br />Material <br />Labor and Benefits <br />Equipment Rental <br />Tax <br />15,952.00 <br />9,153.00 <br />3,150.00 <br />494.00_ <br />TOTAL 28.740.00 <br />87 00 <br />Prepared by: Mike Ward C//� Gf Date Estimate Prepared <br />Accepted by: <br />Representing <br />ESTIMATE GOOD FOR 6 MONTHS <br />cc: Bldg. Permit Center <br />Mark Sadler <br />Gordon Witcher <br />Matt Welborn <br />Mike Ward <br />Randy Allen <br />Paul McKee <br />10/9113 <br />S:NC0mmon\cleriealtCosGesfa012\ 8800 Evergreen Way (a) 101113.doe <br />
The URL can be used to link to this page
Your browser does not support the video tag.