My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8920 EVERGREEN WAY THE RESERVE 2018-01-02 MF Import
>
Address Records
>
EVERGREEN WAY
>
8920
>
THE RESERVE
>
8920 EVERGREEN WAY THE RESERVE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2022 3:55:48 PM
Creation date
2/10/2017 1:54:06 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8920
Tenant Name
THE RESERVE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
end <br />PUBLIC WORKS PERMIT <br />Date: <br />7/17/2013 <br />Public Works Permit #: <br />PW1307-008 <br />City of Everett Public Works Department <br />Building Permit #; <br />B1306-038 <br />3200 Cedar Street <br />Everett, WA 98201 <br />Planning Reference#: <br />SEPA13-008 <br />(425) 257-8810 <br />Public Works Fee $: <br />$ 57,613.22 <br />Other $: <br />OWNER NAME AND ADDRESS: <br />I APPLICANT NAME AND ADDRESS: <br />CKS COMMUNITIES LLC <br />3424 VIA OPORTO SUITE 201 <br />NEWPORT CA 92663 <br />BEACH PHONE: <br />PHONE: <br />TAX PARCEL ID # 00392300000301 SITE ADDRESS: 8920 EVERGREEN WAY . <br />DESCRIPTION OF PROPOSED WORK: <br />PW FOR NEW SENIOR LIVING APARTMENTS -THE RESERVE AT EVERETT <br />PERMIT CONDITIONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Per approved plan dated 9/19/2013. <br />�q <br />Your public works inpsector is Cliff Lindman. Please call (425j25%iffi�forany�ins�ect s�or�ue�io�r sT <br />r'l. <br />L8 <br />�r <br />1 L• <br />O <br />rr <br />r <br />OLCC''GO>O F•f.Jl� <br />p_N�]r.1-]LmL-LL�^^]o C. .L <br />GN OCA0 S? <br />t <br />G• <br />Vl <br />1`JGY p�C.^O�OZ <br />-r• <br />V <br />vi <br />���r�'^��2 � %) <br />Approved for Construction Date <br />cLiy- 4AAMA5�(f 4^ g /-s <br />FINAL INSPECTION Dale <br />Approved as Constructed <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned owner/applicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise - <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. <br />� 7 it <br />Signature of Applicant Date <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 18D DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.