J. Troffer <br />Inspected resteel and forms for footings on lines 1 through 15 and found <br />7/5/66 <br />same to conform b structural plans. Condition of soils was extremely <br />ihard clay, with gravel, except very top, which had been softened by <br />rains. Inspected and placed 18 1/2 c.y., 5 1/2 sk. std. cement 2500 psi, <br />1 1/2" aggregate, 4" slump in above noted footings. Material supplieii <br />by C-Star Sand & Gravel. Material appeared bo contain a very high <br />percentage of sand. Cast 5 cyls, marked 1-A,B,C,D,E, Hold D & E <br />for Contractor's instructions. Called Plant to procure weights of <br />mix. Weights as follows - Cement 576# per yd., 928# 7/8 aggregate, <br />928# 1 1/2" aggregate, 1408# sand. <br />Armstrong <br />Inspected resteel and forms for the spread footings along R 9 - 10, <br />7/7/66 <br />P. - Q 9. 7 - 9 D there was water in bottom of area to be poured. <br />Labor Forman is going to pour the concrete, and force the water out <br />to a low spot and pump it out (Q-9). Also footings (Spread) along <br />6 & 8 Q. An extra bar was placed in 6 F -E by mistake. At point <br />8 P, short bars were scabhed onto tie bars.- looked OK and would be <br />burried in foundation wall. Punk mix is going in under lines <br />A,B,C,D. 10-14 and Office area, D 9-18. 3 cyls. 2-A,B,C. <br />J. Troffer <br />I spected resteel and forms for column footings 9 D, 10 F, 10 LL, 10 K, <br />7/13/66 <br />1, F, 12 H, 12 K, 14 K, 12 NJ, 14 M, 16 M, 12 P, 14 P, 16 P on line <br />R between lines 11 & 17, 17 Q, 17 P, 18 P, 18 N & 18 Pt and found same <br />to conform to structural plans. Inspected and placed 22 1/2 c.y., <br />5 1/2 sk. 1 1/2" & 7/8 1 aggregate, 3 1/2" slump 2/ Darex in above <br />noted footings. Material supplied by C-Star Sand & Gravel. Cast <br />3 cyls, marked 3-A,B,C. <br />J. Troffer <br />Inspected resteel for footings in office .area and on D between lines <br />7/15/66 <br />10 and 14 and found same to conform to structural plans. Inspected <br />and placed 21 c.y., 5 1/2 sk, std. cement, 1 1/2" aggregate, 3 1/21, <br />slump in said footings. Material supplied by C-Star. Cast 3 cyls. <br />marked 4-A,B,C. <br />J. Troffer <br />Inspected resteel for floor slab from line R minus 410" to line O, <br />7/19/66- <br />between lines 10 and 17 and from line N to P between lines 10 and 18 <br />and found same to conform to structural plans except dowels at con- <br />struction joints incomplete. <br />J. Troffer <br />Corrections noted 7/19 made before or during pour. Inspected and placed <br />7/20/66 <br />72 1/2 c.y., 5 1/2 sk. std. cement, 7/8" aggregate, 3 1/2" slump in <br />slab from line R minus 4' 0" to line 0, between lines 10 and 17 and <br />from N to P, between lines 10 and 14. Material supplied by C-Star. <br />Cast 3 cyls, marked 5-A,B,C. <br />