Laserfiche WebLink
ENGINEERS /�',�\ SEATTLE BD. WASHINGTON <br />.��� 1110. 17TH AVENUE %Z$T <br />CHEMISTS PHONE ATWATER 1•EEeS <br />PACIFIC TES1fIN O TORIES <br />IF <br />REPORT OF INSPECTION OF REINFORCED OONCRETE Page 3 <br />Permit No. 4511 City of Everett Contractor <br />Name of Bldg. Valu-Mart # 12, Everett <br />at <br />INSPECTOR I - - REMARKS _ -- <br />AND DATE <br />H. Grant <br />Inspected resteel for slabs, tilt up panels and grade wall. Poured <br />8/4/66 <br />21 c.y., 6 sk, 1 1/211 aggregate in tilt up panels E 3 and C 2, stand. <br />eL-ment, C-Star Sand & Gravel. Rejected 1st load - too wet- sent <br />back. Poured 84 yds., 5 1/2 sk., 7/8 aggregate floor slabs Q & R, <br />9-10 between It & J, 7-10, P & Q, 9-10, It & G, 7-10, O & P, 7-10 <br />Grade walls between D & F on 6. Cyls for floor slabs 16-A,B,C, and <br />panels Cyls 5-A,B,C. Poured floor slab rest rooms - office area. <br />H. Grant <br />Inspected resteel for slabs. Poured 73 yds., 5 1/2 sk., 2500 psi, <br />8/5/66 <br />7/8 aggregate, 31, slump, C-Star Sand & Gravel. Poured floor slab <br />between D & E, 7-12, between G & if, 7-8, office area between A & D, <br />10-12 and 13, 14. Cast 3 cyls, 17-A,B,C. <br />H. Grant <br />Inspected resteel for floor slabs office area and 3 tilt up slabs. <br />8/8/66 <br />Poured 28 yds., 6 sk., 1 1/21, gravel, 3000 psi, concrete by C-Star <br />3 tilt up slabs C2, A2 & L3. Cast 3 cyls marked 18-A,B,C. Poured <br />balance of office floor slab and slab between P & R, 17-18 and G & 11, <br />13-17, C-Star, 5 1/2 sk., 7/8 aggregate, 70 yds., 2500 psi. No cyls. <br />H. Grant <br />Inspected resteel for floor slabs, poured 63 yds., 5 1/2 sk., 7/8 <br />8/9/66 <br />aggregate, 2500 psi standard cement, C-Star, floor slabs between L & M <br />16-18, G & H, 17-18, J & K, 15-18, M & 0, 6-7. Cast 3 cyls. 19-A,B,C. <br />H. Grant <br />Inspected resteel for floor slabs and tilt up panels. Poured 56 yds. <br />8/10/66 <br />5 1/2 sk., 7/8 agg., standard cement, 311 slump between H & J 12-15, <br />K & 1 14-18,poured 19 yds., 6 sk., 1 1/211 aggregate, 311 slump- panels <br />J3 and K2. Cast 3 cyls. 20-A,B,C. <br />H. Grant <br />Inspect-d resteel and concrete -poured 51 yds., 5 1/2 sk., 7/8 aggregate, <br />8/11/66 <br />31, slump, 2500 psi, between H & J 15-18, E & F 12-15, C-Star Sand <br />& Gravel. Poured 19 yds., 6 sk., 1 1/21, agg., 31, slump. Cast 3 <br />cyls. 21-A,B,C. Cont. ordered 10% extra 1 1/211 agg. and reduced <br />sand 10% for panels only. <br />H. Grant <br />Inspected resteel for tilt up panels and floor slabs. Poured 86 yds., <br />8/12/66 <br />6 sk., 1 1/21, aggregate, 311 slump in panels N2, K1, N3, Al, G2, C4, <br />X1, Pl, A3, G1. Cast 6 cyls. 22-A,B,C. and Contractor - 22-A,B,C. <br />Poured 21 yds., 5 1/2 sk., 7/81, aggregate, 31, slump, floor slabs <br />between D & E 12-15. No cyls. <br />H. Grant <br />Inspected resteel for tilt up panels and floor slab. Poured 20 yds., <br />8/15/66 <br />6 sk., 1 1/211 aggregate, 311 slump, 3000 psi. Cast 3 cyls 23-A,B,C. <br />Poured 35 yds. floor slab between F & G 13-15, between K & t., 6-7 <br />between L & M, 6-7. <br />